Permit: TD-DEV-1222-00060
Permit Details
Apply Date:
12/05/2022
Applicant:
David Toro
Description:
Revision 1 - The proposed scope of work for this Chick-fil-A reinvestment project includes the addition of a 2-lane order point canopy and a single lane outside meal delivery canopy. Additionally, there is an expansion of the drive thru into a second lane, new parking lot layout, and the relocation of a light pole and transformer.
Permit Reviews
Permit Number - TD-DEV-1222-00060
Permit Status: Complete
Permit Description: Revision 1 - The proposed scope of work for this Chick-fil-A reinvestment project includes the addition of a 2-lane
order point canopy and a single lane outside meal delivery canopy. Additionally, there is an expansion of
the drive thru into a second lane, new parking lot layout, and the
relocation of a light pole and transformer.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/11/2025 | DEVELOPMENT PACKAGE NEW REVISION v.2 | 05/20/2025 | APPROVED |
| 04/02/2025 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 04/02/2025 | REQUIRES RESUBMIT |
| 12/14/2022 | DEVELOPMENT PACKAGE REVIEW v.1 | 12/23/2022 | REQUIRES RESUBMIT |
| 04/02/2025 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 04/07/2025 | REQUIRES RESUBMIT |
| 08/18/2023 | DEVELOPMENT PACKAGE REVIEW v.2 | 09/18/2023 | REQUIRES RESUBMIT |
| 01/31/2025 | DEVELOPMENT PACKAGE NEW v.5 | 03/07/2025 | APPROVED |
| 08/23/2024 | DEVELOPMENT PACKAGE NEW v.2 | 09/27/2024 | REQUIRES RESUBMIT |
| 10/08/2024 | DEVELOPMENT PACKAGE NEW v.3 | 11/15/2024 | REQUIRES RESUBMIT |
| 11/15/2024 | DEVELOPMENT PACKAGE NEW v.4 | 12/12/2024 | REQUIRES RESUBMIT |
| 06/03/2024 | DEVELOPMENT PACKAGE NEW v.1 | 07/10/2024 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Complete
Permit Number: TD-DEV-1222-00060
Permite Description: Revision 1 - The proposed scope of work for this Chick-fil-A reinvestment project includes the addition of a 2-lane
order point canopy and a single lane outside meal delivery canopy. Additionally, there is an expansion of
the drive thru into a second lane, new parking lot layout, and the
relocation of a light pole and transformer.
Total Outstanding Inspections - 7
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/08/2025 | N/A | Not Ready | Rebar and the forms are not complete. Also there is cross section A on DP page 14 that shows a curb above grade. Curb is not shown in other details. Architect needs to clarify. | |
| 09/18/2025 | ENGR Paving | N/A | Partial Pass | 9/18/25 Drive Through concrete pour on east side broom finish looks good. Thickened edge at north joint is correct with mesh overlap. Drainage to Basin at Oracle looks good. Curb reveals good. Cylinder for 4000 psi concrete by Terracon taken. The AB compaction test 100% North side of Drive through now being prepared. Subgrade and AB test will be submitted. |
| 08/29/2025 | For trash and recycling enclosures | N/A | Partial Pass | 9/2/25 Okay to pour footer up to front bollards/hinges. Okay to pour front bollards when correct length per revision are in place. reinforcing/layout correct per TSMR. |
| 09/15/2025 | N/A | Partial Pass | 9/15/25 Initial grading looks good to plan. Basins to the east of site are rough cut and look good to plan and survey. The site primarily will drain from the east of the building into the basins to the east side and then the rest towards the west and into curb cuts on the way. Curbs and curb cuts look good. The area contractor is now focusing on is the concrete Drive-through area to the east of the building. The subgrade needs to be compacted to 95% beneath and pavement. The AB needs to be compacted to 100% under pavement. Drive through subgrade will be 10" below finish grade. 6" pavement and 4" AB. Submit the results to the portal. The area is supposed to be ready on Wednesday to Check grade in ABC. Blue tops or string line are acceptable. |
|
| 09/17/2025 | N/A | Partial Pass | 9/17/25 Contractor has prepped AB for drive-through on east side of building. Subgrade is 95 +%. Curb marks indicated 4” for AB correct. Expansion material in place at curbs. Contractor has installed the number four hooks tied into remesh at thickened edges, and tied it to remesh is placed in the rest of the slab. per plan. Forms look good. Okay to pour this concrete. pending min 95% compaction tests for AB. Concrete needs to show 4000 psi Also, the retaining wall along northern edge has under drain and gravel pocket, installed with the geographic in place correctly OK to backfill the retaining wall per plan. Terracon is testing backfill compaction. |
|
| 10/16/2025 | Consultation SITE | N/A | Partial Pass | 10 16 25 Partial pass- you can call more if needed. I discussed with contractor the details in the lanscaping that we would be looking at including root barriers for trees that are closer than 5' to paving. Also the the depressed landscaping 6-9" below nearest pavement in water harvesting infiltration areas. Request landscaping inspection for root barriers as discussed before covering them. |
| 10/20/2025 | N/A | Partial Pass | 10/12/25 Planting matches landscaping plan well, the levels below asphalt look good in WHIAs look good and staking correct. Trees root barriers are correct within 5' of all paving. 2' deep thick plastic panels, open sides pointing in direction without paving. |
Completed Inspections
Permit Status: Complete
Permit Number: TD-DEV-1222-00060
Permit Description: Revision 1 - The proposed scope of work for this Chick-fil-A reinvestment project includes the addition of a 2-lane
order point canopy and a single lane outside meal delivery canopy. Additionally, there is an expansion of
the drive thru into a second lane, new parking lot layout, and the
relocation of a light pole and transformer.
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/21/2025 | PDSD Engineering Division Pre-Construction SITE | Passed | 8/21/25 Contractor will have city stamped DP and any revisions at next inspection. Check for TSMR on Refuse Enclosure. DP keynote 2 calls for minimum standards TSM sec 8...Refuse Enclosure-looks to be different design on sheet 12. I went over the scope of work with contractor and what inspections need to be done. |
|
| 09/08/2025 | SITE - Sign Footer/Setback/Excavation Layout/Rebar | Passed | 9/8/25 Subcontractor set 4 light pole bases to 3’ above Asphalt. the Finish grade on the 4 light poles is not the asphalt. The 2 menuboards detail calls for 1” threaded rod for bolts. It is less. The 2 height clearance bar footers also need to have grade verified. 9/8/25 Forms, setbacks, elevations, rebar and hardware are correct for all 4 light poles and 2 menu and 2 clearance pole footers. Okay to pour Footers. |
|
| 10/27/2025 | ENGR Engineering Final | Passed | ||
| 10/21/2025 | COT - FCON - Fire - Final | Passed | ||
| 10/23/2025 | LAND Landscape Appearance & Function Final | Passed | ||
| 10/23/2025 | Final inspection to ensure all landscape and water harvesting SITE | Passed | ||
| 10/27/2025 | COT - ENGR - Signage Final | Passed |