Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR Paving
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/18/2025 | ENGR Paving | Partial Pass | 9/18/25 Drive Through concrete pour on east side broom finish looks good. Thickened edge at north joint is correct with mesh overlap. Drainage to Basin at Oracle looks good. Curb reveals good. Cylinder for 4000 psi concrete by Terracon taken. The AB compaction test 100% North side of Drive through now being prepared. Subgrade and AB test will be submitted. |