Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Partial Pass
Inspection History
Permit Number - TD-DEV-1222-00060
Inspection Description -
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/05/2025 | Partial Pass | 200 LF vert curb was installed this morning along S Edge of parking lot . KDC is at risk if the curb is not correct. | ||
| 09/15/2025 | Partial Pass | 9/15/25 Initial grading looks good to plan. Basins to the east of site are rough cut and look good to plan and survey. The site primarily will drain from the east of the building into the basins to the east side and then the rest towards the west and into curb cuts on the way. Curbs and curb cuts look good. The area contractor is now focusing on is the concrete Drive-through area to the east of the building. The subgrade needs to be compacted to 95% beneath and pavement. The AB needs to be compacted to 100% under pavement. Drive through subgrade will be 10" below finish grade. 6" pavement and 4" AB. Submit the results to the portal. The area is supposed to be ready on Wednesday to Check grade in ABC. Blue tops or string line are acceptable. |
||
| 10/01/2025 | Partial Pass | 10/1/25 Straight portion of driveway to far S of project -Subgrade is correct and compaction report will be submitted. Ready for AB. Main Parking lot to south of Building. Subgrade correct and AB is currently being graded to blue tops. Compaction report of AB to be submitted. Slopes at ADA parking and Accessible Routes good. |