Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: SITE - Sign Footer/Setback/Excavation Layout/Rebar
Permit Number - TD-DEV-1222-00060
Inspection Description - SITE - Sign Footer/Setback/Excavation Layout/Rebar
Inspection Status - Passed
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/08/2025 | SITE - Sign Footer/Setback/Excavation Layout/Rebar | Passed | 9/8/25 Subcontractor set 4 light pole bases to 3’ above Asphalt. the Finish grade on the 4 light poles is not the asphalt. The 2 menuboards detail calls for 1” threaded rod for bolts. It is less. The 2 height clearance bar footers also need to have grade verified. 9/8/25 Forms, setbacks, elevations, rebar and hardware are correct for all 4 light poles and 2 menu and 2 clearance pole footers. Okay to pour Footers. |