Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TD-DEV-1124-00312
Permit Details
Status:
In Review
Type:
Development Package
Address:
7405 S PASEO GRAN ESCALERA
Address NEW:
7405 S PASEO GRAN ESCALERA
Apply Date:
11/20/2024
Applicant:
CLINT ELDER
Description:
PRIVATE GRADING & DRAINAGE PLAN for LA ESCALERA PHASE 4, LOTS 1-215 related to TD-DEV-0224-00061
Permit Reviews
Permit Number - TD-DEV-1124-00312
Permit Status: In review
Permit Description: PRIVATE GRADING & DRAINAGE PLAN for LA ESCALERA PHASE 4, LOTS 1-215 related to TD-DEV-0224-00061
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/24/2025 | DEVELOPMENT PACKAGE NEW v.2 | 02/10/2025 | APPROVED |
| 09/16/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/22/2025 | APPROVED |
| 12/16/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/22/2025 | APPROVED |
| 11/27/2024 | DEVELOPMENT PACKAGE NEW v.1 | 01/21/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TD-DEV-1124-00312
Permit Status: In review
Permit Description: PRIVATE GRADING & DRAINAGE PLAN for LA ESCALERA PHASE 4, LOTS 1-215 related to TD-DEV-0224-00061
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 01/09/2025 | Wall permits must be on file before the DP can be closed. |
| 12/12/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
| 12/12/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Outstanding Inspections
Permit Status: In Review
Permit Number: TD-DEV-1124-00312
Permite Description: PRIVATE GRADING & DRAINAGE PLAN for LA ESCALERA PHASE 4, LOTS 1-215 related to TD-DEV-0224-00061
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/13/2025 | NPPO Monitoring | N/A | Complete (Recurring) | See checklist items for details. 6/25/25 Temporary irrigation system has been installed in Nursery. |
| 09/19/2025 | SITE - Stormwater Follow-up | N/A | Failed | 9/19/25 1. The track out at Lalas Way needs to be repaired to function as in intended currently there is a bypass with no rock on it. 2. The trench berm is not continuous on east side of site. It is interrupted approximately at lot 142 and there is another interruption north of that area. There is another area at Lot 15 on West side where there is no BMP. The SWPPP has continuous BMP’s around Perimeter. 3. The grade Limit T Posts and rope have been knocked over at the NE of site, just west of the Storm Basin. These need to be repaired. 4. On plan it shows OP outlet protection at low point at perimeter at SE end of Site. There is just Trench Berm at this point. 5. inspection Reports need to be kept in SWPPP book. |
| 11/03/2025 | N/A | Partial Pass | 11/3/25 4-24" RCP (CL II) Drain Pipe. Coming from ROW Catch Basin. Approximately 20' of the RCP is outside ROW running .08% downgrade to Basin N1. Pipes layed out by survey and inverts elevations correct. Pipes bedded in bedding sand. Shaded with bedding sand and AB over shading. When I arrived AB was being compacted with Whacker. I was provided pictures of bedding and shading being compacted with whacker. Second pipe from last to the north, segment furthest east did not have correct downslope (.08%) Contracter corrected this. Contractor notified of need to schedule inspections for drain pipe/structures on the DP outside of ROW for the duration of the project. |
|
| 10/30/2025 | N/A | Failed | 10/30/25 East side of Subdivision. Footer Rebar layout is not to plan for Partial View Fence. Columns are only being built at the property lines of each lot. Plan calls for them at 136" on center. |
|
| 12/12/2025 | ENGR - Drainage Structures | N/A | Partial Pass | 12/12/25 North Basin N1. Weir Subgrade. The Basin weir was overbuilt and passed compaction test. Weir Subgrade was cut to correct elevation and profile. Weir Elevation and Top of Basin Elevations correct. Built correct to 11/6 and 12/6. Okay to pour floor of concrete Weir. |
| 12/11/2025 | N/A | Failed | 12/11/25 Site not graded per plan. Lots do not match rough grading detail 2/6. Correct or provide letter from EOR that grading is acceptable. Provide compaction test results with letter. |
Completed Inspections
Permit Status: In Review
Permit Number: TD-DEV-1124-00312
Permit Description: PRIVATE GRADING & DRAINAGE PLAN for LA ESCALERA PHASE 4, LOTS 1-215 related to TD-DEV-0224-00061
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/02/2025 | NPPO Pre-Construction | Passed | 5/2/25 TOS Accounted for. Nursery ok. Ok To start grubbing. Do not disturb plants with orange tape. See checklist items for details. |
|
| 05/01/2025 | PDSD Engineering Division Pre-Construction SITE | Passed | ||
| 06/27/2025 | SITE - Stormwater Setup and Controls | Passed | When grading is not active soil stabilizers per the swppp plan will be used. All Inlets at curb along Gran Escalera need to be gravel bagged correctly per plan. The Swppp with AMH expires 6/30/25 I have verified the new Swppp agreement with KB Homes as the Owner/Developer of the new plan and CMG as having 3rd party operational control…It is Signed and looks correct. New signed Plan will be uploaded today 6/27/25 See checklist items for details. |
|
| 12/15/2025 | Passed | Rough grading completed and passed per letter of acceptance from Engineer of Record Martin V. Magelli #36655 |