Inspection Status: Partial Pass

Inspection History: NPPO Monitoring

Date Description Inspector Results Comments
03/10/2026 NPPO Monitoring Partial Pass 3/10/26
Nursery plants have been TOS. The TOS planting locations are all outside the site walls along the road of Escalera to the west, Valencia to the North and a little along the East side just South of Valencia by the pathway.

396 Barrel cactus (Ferocactus Wislizenii) have survived and been planted. 393 will need to be mitigated for 789 Total required.

26 Palo Verde (Parkinsonia Microphylla) Survived and planted. 306 additional will have to be provided for 332 Total Required.

1 Velvet Mesquite (Prosopis Velutina) survived and was planted. 53 will need to be provided For Total 54 Required.

9 yuccas survived and were planted . 5 will need to be provided for a total of 14

17 Ocotillo (Fouquieria Splendens) survived and were planted . 27 more will need to be provided for a total of 44.

4 PIP Palo Verde did not make it but I will recheck.

The other Species listed and needed for Total Required on site will have to be met through mitigation.
These details are listed on L1.0- 9 of 54 of the Tentative Plat- Native Plant Preservation Worksheet.
05/13/2025 NPPO Monitoring Complete (Recurring) See checklist items for details.

6/25/25
Temporary irrigation system has been installed in Nursery.