Inspection Status: Re-inspection required

Inspection History: SITE - Stormwater Setup and Controls

Permit Number - TD-DEV-1124-00312

Inspection Description - SITE - Stormwater Setup and Controls

Inspection Status - Re-inspection required

Date Description Inspector Results Comments
06/24/2025 SITE - Stormwater Setup and Controls Re-inspection required Swppp control measures need to be implemented by end next working day. Reinspection needed. See checklist items.
06/25/2025 SITE - Stormwater Setup and Controls Re-inspection required See checklist items for details.
06/27/2025 SITE - Stormwater Setup and Controls Passed When grading is not active soil stabilizers per the swppp plan will be used.
All Inlets at curb along Gran Escalera need to be gravel bagged correctly per plan.

The Swppp with AMH expires 6/30/25
I have verified the new Swppp agreement with KB Homes as the Owner/Developer of the new plan and CMG as having 3rd party operational control…It is Signed and looks correct.

New signed Plan will be uploaded today 6/27/25

See checklist items for details.