Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Re-inspection required
Inspection History: SITE - Stormwater Setup and Controls
Permit Number - TD-DEV-1124-00312
Inspection Description - SITE - Stormwater Setup and Controls
Inspection Status - Re-inspection required
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/24/2025 | SITE - Stormwater Setup and Controls | Re-inspection required | Swppp control measures need to be implemented by end next working day. Reinspection needed. See checklist items. | |
| 06/25/2025 | SITE - Stormwater Setup and Controls | Re-inspection required | See checklist items for details. | |
| 06/27/2025 | SITE - Stormwater Setup and Controls | Passed | When grading is not active soil stabilizers per the swppp plan will be used. All Inlets at curb along Gran Escalera need to be gravel bagged correctly per plan. The Swppp with AMH expires 6/30/25 I have verified the new Swppp agreement with KB Homes as the Owner/Developer of the new plan and CMG as having 3rd party operational control…It is Signed and looks correct. New signed Plan will be uploaded today 6/27/25 See checklist items for details. |