Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Re-inspection required
Inspection History: ENGR - Drainage Structures
Permit Number - TD-DEV-1124-00312
Inspection Description - ENGR - Drainage Structures
Inspection Status - Re-inspection required
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/02/2026 | ENGR - Drainage Structures | Re-inspection required | Weir needs 6x6 WWF (W2.1xW2.1) Reschedule inspection when ready. Okay to pour 5’ sidewalk east of weir. after sidewalk is placed 1x3 cutoff wall w/ 6x6 WWF will be poured adjacent to it. |
|
| 02/05/2026 | ENGR - Drainage Structures | Partial Pass | 2/5/26 Basin M1 outlet weir. 6 x 6 WWF W2.1. Remesh in place w/ dobies for clearance. Forms are correct and set to survey and plan. Subgrade density complies. Submit Report to portal. Okay to pour weir. Schedule inspection for adjacent cutoff wall before pouring. |
|
| 02/11/2026 | ENGR - Drainage Structures | Partial Pass | 2/11/26 Basin S1 Outlet Weir. Elevations and slope of Forms are correct, dimensions are correct. Welded Wire is in place and has clearance. Okay to pour 6” weir Schedule inspections for the Cutoff wall of the weirs when ready. |
|
| 02/13/2026 | ENGR - Drainage Structures | Partial Pass | 2/13/26 1'x3' cut off walls with 6" WWF correct. Okay to pour cut off wall at basins M1 and S1. Request inspection for basin N1 cutoff wall when ready. |
|
| 12/12/2025 | ENGR - Drainage Structures | Partial Pass | 12/12/25 North Basin N1. Weir Subgrade. The Basin weir was overbuilt and passed compaction test. Weir Subgrade was cut to correct elevation and profile. Weir Elevation and Top of Basin Elevations correct. Built correct to 11/6 and 12/6. Okay to pour floor of concrete Weir. |