Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TD-DEV-1122-00052
Permit Details
Apply Date:
11/21/2022
Applicant:
Brianna Uy
Description:
SF drive-through coffee shop with customer walk-up window
Permit Reviews
Permit Number - TD-DEV-1122-00052
Permit Status: Complete
Permit Description: SF drive-through coffee shop with customer walk-up window
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/20/2024 | AS-BUILT v.1 | 04/01/2024 | APPROVED |
04/03/2023 | DEVELOPMENT PACKAGE REVIEW v.1 | 05/31/2023 | REQUIRES RESUBMIT |
12/06/2022 | DEVELOPMENT PACKAGE REVIEW v.1 | 12/14/2022 | REQUIRES RESUBMIT |
09/19/2023 | DEVELOPMENT PACKAGE NEW v.2 | 10/19/2023 | REQUIRES RESUBMIT |
07/10/2023 | DEVELOPMENT PACKAGE NEW v.1 | 08/18/2023 | REQUIRES RESUBMIT |
11/01/2023 | DEVELOPMENT PACKAGE NEW v.3 | 11/02/2023 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TD-DEV-1122-00052
Permite Description: SF drive-through coffee shop with customer walk-up window
Total Outstanding Inspections - 4
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/20/2023 | PDSD Site/Engineering Division - NPPO | N/A | Not Applicable | |
01/05/2024 | Verify required native plant protection, relocation, removal is completed prior to activity on job site | N/A | Not Applicable | |
12/20/2023 | NPPO Pre-Construction | N/A | Not Ready | |
04/04/2024 | COT - FCON - Fire - Final | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TD-DEV-1122-00052
Permit Description: SF drive-through coffee shop with customer walk-up window
Total Completed Inspections - 16
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/20/2023 | PDSD Engineering Division Pre-Construction SITE | Passed | ||
01/05/2024 | SITE - SWPPP Correction Notice | Passed | ||
01/05/2024 | City of Tucson (COT) Planning and Development Services Engineering (ENGR) Zoning Compliance Inspection | Passed | ||
01/16/2024 | ENGR - Drainage Structures | Passed | Passed trash enclosure as is. SIDE PIPES/COLUMNS WERE A FOOT TO CLOSE TO EACH OTHER AS PLAN WAS APPROVED THIS WAY. |
|
04/05/2024 | COT - ENGR - Site - Assurance Release | Passed | ||
04/05/2024 | SITE - Stormwater Setup and Controls | Passed | ||
04/05/2024 | SITE - Stormwater Follow-up | Passed | ||
04/05/2024 | COT - ENGR - Stormwater | Passed | ||
04/05/2024 | SITE - Zoning Final | Passed | ||
04/05/2024 | SITE | Passed | ||
04/05/2024 | SITE - Stormwater Final Inspection | Passed | ||
04/12/2024 | ENGR Engineering Final | Passed | Handrail has been installed at the NW section of sidewalk exceeding 5% leading to Trash enclosure. Pedestrian crosswalk areas located at the SW corner leading to public sidewalk and NW drive thru section leading from building to trash enclosure are under 2%. Handicap parking located at the West rear of building is under 2% and handicap and van accessible signs are posted and are at 7’ height from bottom of sign. |
|
04/12/2024 | COT - ENGR - Signage Final | Passed | Panel (L) Circuit #3 (Building Sign) 20 amp breaker verified. Circuit #’s 9,15,17,19,21 are the drive thru and walk up menu boards 20 amp breakers verified. 4725 address numbers are located at the NE rear of building. |
|
04/12/2024 | Final inspection to ensure all landscape and water harvesting SITE | Passed | (10) 15 gal. Mesquite trees verified. (41) 5 gal shrubs verified. (36) grasses verified. All rainwater harvest basin locations have been verified for locations, sizes, depths,and flow line elevations per re-submitted approved plan. |
|
04/12/2024 | ENGR Grading Final | Passed | ||
04/12/2024 | PDSD Site/Engineering Division - Landscaping | Passed | (10) 15 gal. Mesquite trees verified. (41) 5 gal shrubs verified. (36) grasses verified. All rainwater harvest basin locations have been verified for locations, sizes, depths,and flow line elevations per re-submitted approved plan. |