Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/05/2024 | ENGR Engineering Final | Not Ready | ||
| 04/05/2024 | ENGR Engineering Final | Not Ready | ||
| 04/12/2024 | ENGR Engineering Final | Passed | Handrail has been installed at the NW section of sidewalk exceeding 5% leading to Trash enclosure. Pedestrian crosswalk areas located at the SW corner leading to public sidewalk and NW drive thru section leading from building to trash enclosure are under 2%. Handicap parking located at the West rear of building is under 2% and handicap and van accessible signs are posted and are at 7’ height from bottom of sign. |
|
| 04/12/2024 | ENGR Engineering Final | Passed | Handrail has been installed at the NW section of sidewalk exceeding 5% leading to Trash enclosure. Pedestrian crosswalk areas located at the SW corner leading to public sidewalk and NW drive thru section leading from building to trash enclosure are under 2%. Handicap parking located at the West rear of building is under 2% and handicap and van accessible signs are posted and are at 7’ height from bottom of sign. |