Inspection History Details
Inspection Status: Partial Pass
Inspection History: Final inspection to ensure all landscape and water harvesting SITE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/05/2024 | Final inspection to ensure all landscape and water harvesting SITE | Partial Pass | ||
| 01/05/2024 | Final inspection to ensure all landscape and water harvesting SITE | Passed | ||
| 03/07/2024 | Final inspection to ensure all landscape and water harvesting SITE | Not Ready | ||
| 03/07/2024 | Final inspection to ensure all landscape and water harvesting SITE | Not Ready | ||
| 04/05/2024 | Final inspection to ensure all landscape and water harvesting SITE | Not Ready | ||
| 04/05/2024 | Final inspection to ensure all landscape and water harvesting SITE | Passed | ||
| 04/12/2024 | Final inspection to ensure all landscape and water harvesting SITE | Passed | (10) 15 gal. Mesquite trees verified. (41) 5 gal shrubs verified. (36) grasses verified. All rainwater harvest basin locations have been verified for locations, sizes, depths,and flow line elevations per re-submitted approved plan. |