Inspection History Details
Inspection Status: Not Ready
Inspection History: PDSD Site/Engineering Division - Landscaping
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/07/2024 | PDSD Site/Engineering Division - Landscaping | Not Ready | ||
| 04/05/2024 | PDSD Site/Engineering Division - Landscaping | Not Ready | ||
| 04/12/2024 | PDSD Site/Engineering Division - Landscaping | Passed | (10) 15 gal. Mesquite trees verified. (41) 5 gal shrubs verified. (36) grasses verified. All rainwater harvest basin locations have been verified for locations, sizes, depths,and flow line elevations per re-submitted approved plan. |