Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR - Drainage Structures
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/05/2024 | ENGR - Drainage Structures | Partial Pass | All horizontal and vertical rebar for footer is in place and ready for concrete. | |
| 01/16/2024 | ENGR - Drainage Structures | Passed | Passed trash enclosure as is. SIDE PIPES/COLUMNS WERE A FOOT TO CLOSE TO EACH OTHER AS PLAN WAS APPROVED THIS WAY. |