Permit: TD-DEV-1122-00021
Permit Details
Status:
Approved
Type:
Development Package
Address:
10041 E OLD VAIL RD
Address NEW:
10041 E OLD VAIL RD
Apply Date:
11/03/2022
Applicant:
Jake Hughes
Description:
Revision 1 - New Indoor Storage Facility
Permit Reviews
Permit Number - TD-DEV-1122-00021
Permit Status: Approved
Permit Description: Revision 1 - New Indoor Storage Facility
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/27/2023 | DEVELOPMENT PACKAGE REVIEW v.3 | 07/19/2023 | REQUIRES RESUBMIT |
| 01/24/2023 | DEVELOPMENT PACKAGE REVIEW v.2 | 01/31/2023 | REQUIRES RESUBMIT |
| 06/09/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/30/2025 | APPROVED |
| 10/20/2023 | DEVELOPMENT PACKAGE NEW v.2 | 11/24/2023 | APPROVED |
| 12/19/2024 | DEVELOPMENT PACKAGE NEW REVISION v.2 | 01/13/2025 | APPROVED |
| 11/07/2022 | DEVELOPMENT PACKAGE REVIEW v.1 | 12/08/2022 | REQUIRES RESUBMIT |
| 08/24/2023 | DEVELOPMENT PACKAGE NEW v.1 | 10/03/2023 | REQUIRES RESUBMIT |
| 10/30/2024 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 12/18/2024 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Approved
Permit Number: TD-DEV-1122-00021
Permite Description: Revision 1 - New Indoor Storage Facility
Total Outstanding Inspections - 8
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/30/2024 | ENGR - Drainage Structures | N/A | Partial Pass | okay to pour west head wall footing and bot North catch basins. waiting for pictures for east footing. |
| 11/13/2024 | ENGR Grading Final | N/A | Partial Pass | Drive way has been inspected on 11/13/24. Grading is approved for asphalt. All 3rd party inspections and testing needs to be submitted to the portal. |
| 10/24/2024 | SITE - Stormwater Setup and Controls | N/A | Not Ready | Failed |
| 11/27/2024 | SITE - Stormwater Follow-up | N/A | Complete (Recurring) | SWPPP okay. equipment operation should be limited to on-site operation. |
| 05/23/2025 | Final inspection to ensure all landscape and water harvesting SITE | N/A | Not Ready | These need to be completed including landscaping |
| 06/06/2025 | SITE - Stormwater Final Inspection | N/A | Not Ready | 06/06/25, Stormwater will not be signed off until all work is completed on inlets to the basins. Notice of termination will also have to be submitted to the portal for final sign off. |
| 04/08/2025 | COT - ENGR - Stormwater | N/A | Complete (Recurring) | |
| 07/31/2025 | ENGR Engineering Final | N/A | Not Ready | This development package cannot be closed until drainage issue is resolved, or a solution is provided. C of O for the building, permit #TC-COM-1122-00044 will be supported, call in all final building inspections. |
Completed Inspections
Permit Status: Approved
Permit Number: TD-DEV-1122-00021
Permit Description: Revision 1 - New Indoor Storage Facility
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/12/2024 | PDSD Engineering Division Pre-Construction SITE | Passed | inform the contractor to call in every two weeks for stormwater follow up. The tracker out rock are in place the wattles are in place |
|
| 11/12/2024 | SITE - Sign Footer/Setback/Excavation Layout/Rebar | Passed | ||
| 02/05/2025 | SITE - Stormwater Setup and Controls | Passed | ||
| 05/14/2025 | SITE - Stormwater Follow-up | Passed | Work can be started on the notice of termination letter required to close this inspection out. | |
| 05/16/2025 | ENGR Paving | Passed | 05/16/25, everything looks good to continue paving this site. | |
| 06/19/2025 | Consultation SITE | Passed | Consultation on the dumpster pad directly behind the building. Plan will,have to sent in for review and Andy Vera with environmental will have to have the final word on whether or not this new ramp design will work for them. I see no issues that PDSD would have. It would be allowable in this case of the enclosure wall blocking the path of water coming out of the roof drain to enter through the wall and discharge out the front of the enclosure. On the front of the drive lane at the front entrance to the lot where the hump in pavement is it sounds like it can be made to work. There can be no more than a 5% grade at the pedestrian access across the driveline. Once this is sent in for review there will be a final determination. At the north end of the driveway channel to the basing the 5' of leading edge of riprap will have to be grouted in place. |
|
| 06/25/2025 | SITE - Stormwater Final Inspection | Passed | ||
| 07/30/2025 | For trash and recycling enclosures | Passed | Floors and aprons complete. |