Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR - Drainage Structures
Permit Number - TD-DEV-1122-00021
Inspection Description - ENGR - Drainage Structures
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/30/2024 | ENGR - Drainage Structures | Partial Pass | okay to pour west head wall footing and bot North catch basins. waiting for pictures for east footing. | |
| 11/06/2024 | ENGR - Drainage Structures | Partial Pass | Finial inspection will be next on drainage structures. Basin will be greatly impacted by flow off of site and needs to be looked at to insure it will work as designed. |