| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/14/2025 | For trash and recycling enclosures | Not Ready | 05/14/25, Footing and bollards were completed without inspections being done. Either GPR now needs to be completed or engineer on record will have to certify proper placement of both. Enclosure adjacent to building bollards need to have 10' of separation between them, these are at 8'-9". Again this enclosure was completed at footing and bollards with no inspections. | |
| 05/15/2025 | For trash and recycling enclosures | Partial Pass | 05/15/25, enclosure to the outside of lot can be grouted on the first lift. | |
| 05/23/2025 | For trash and recycling enclosures | Not Ready | Nothing is completed, walls, grout, gates etc. | |
| 05/23/2025 | For trash and recycling enclosures | Not Ready | Nothing is completed, walls, grout, gates etc. | |
| 06/06/2025 | For trash and recycling enclosures | Partial Pass | 06/-6/25, Bollards are 2'-6" below grade but are set 10'-6" apart rather than the 10' required. Set form to out side of wall is 1'-6" should be 1'-8". Slab rebar looks good. Pour everything as is. | |
| 06/25/2025 | For trash and recycling enclosures | Partial Pass | additional vertical support at front enclosure added to meet COT standards. Okay to grout to 4ft on both enclosures. | |
| 06/26/2025 | For trash and recycling enclosures | Passed | Vertical reinforcement and bond beam are good, okay to grout to top on both enclosures. | |
| 07/30/2025 | For trash and recycling enclosures | Passed | Floors and aprons complete. |