Permit: TD-DEV-1023-00417
Permit Details
Apply Date:
10/10/2023
Applicant:
Description:
THE MONTESSORI SCHOOLHOUSE PLANS TO CHANGE THE EXISTING USE OF THE SINGLE FAMILY RESIDENCE TO OFFICES FOR THEIR CHARTER MIDDLE SCHOOL. THE EXISTING TOILETS IN THE BEDROOMS WILL BE DEMOLISHED. ONE NEW ADA RESTROOMS WILL BE LOCATED IN THE EXISTING TOILET AREA. A RAMP TO PROVIDE ADA ACCESS WILL BE PROVIDED ON THE WEST ELEVATION OF THE MAIN RESIDENCE. NO CHANGES WILL BE MADE TO THE ELEVATIONS VISIBLE FROM 6TH AVE TO ALLOW THE STRUCTURE TO REMAIN AS A CONTRIBUTING RESIDENCE TO FELDMAN'S HISTORIC DISTRICT. A NEW BUILDING FOR CLASSROOMS WILL BE ADDED ON THE WEST PORTION OF THE LOT. THE BUILDING WILL BE WOOD FRAMED STUCCO WITH BOTH BUILT-UP ROOF AND STANDING SEAM METAL ROOF. PARKING WILL BE PROVIDED ON THE WEST SIDE OF THE LOT.
Permit Reviews
Permit Number - TD-DEV-1023-00417
Permit Status: Complete
Permit Description: THE MONTESSORI SCHOOLHOUSE PLANS TO CHANGE THE EXISTING USE OF THE SINGLE FAMILY RESIDENCE TO OFFICES FOR THEIR CHARTER MIDDLE SCHOOL. THE EXISTING TOILETS IN THE BEDROOMS WILL BE DEMOLISHED. ONE NEW ADA RESTROOMS WILL BE LOCATED IN THE EXISTING TOILET AREA. A RAMP TO PROVIDE ADA ACCESS WILL BE PROVIDED ON THE WEST ELEVATION OF THE MAIN RESIDENCE.
NO CHANGES WILL BE MADE TO THE ELEVATIONS VISIBLE FROM 6TH AVE TO ALLOW THE STRUCTURE TO REMAIN AS A CONTRIBUTING RESIDENCE TO FELDMAN'S HISTORIC DISTRICT.
A NEW BUILDING FOR CLASSROOMS WILL BE ADDED ON THE WEST PORTION OF THE LOT. THE BUILDING WILL BE WOOD FRAMED STUCCO WITH BOTH BUILT-UP ROOF AND STANDING SEAM METAL ROOF. PARKING WILL BE PROVIDED ON THE WEST SIDE OF THE LOT.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/06/2023 | DEVELOPMENT PACKAGE NEW v.3 | 12/14/2023 | REQUIRES RESUBMIT |
| 12/14/2023 | DEVELOPMENT PACKAGE NEW v.4 | 12/14/2023 | APPROVED |
| 10/10/2023 | DEVELOPMENT PACKAGE NEW v.1 | 10/17/2023 | REQUIRES RESUBMIT |
| 10/27/2023 | DEVELOPMENT PACKAGE NEW v.2 | 12/05/2023 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Complete
Permit Number: TD-DEV-1023-00417
Permite Description: THE MONTESSORI SCHOOLHOUSE PLANS TO CHANGE THE EXISTING USE OF THE SINGLE FAMILY RESIDENCE TO OFFICES FOR THEIR CHARTER MIDDLE SCHOOL. THE EXISTING TOILETS IN THE BEDROOMS WILL BE DEMOLISHED. ONE NEW ADA RESTROOMS WILL BE LOCATED IN THE EXISTING TOILET AREA. A RAMP TO PROVIDE ADA ACCESS WILL BE PROVIDED ON THE WEST ELEVATION OF THE MAIN RESIDENCE.
NO CHANGES WILL BE MADE TO THE ELEVATIONS VISIBLE FROM 6TH AVE TO ALLOW THE STRUCTURE TO REMAIN AS A CONTRIBUTING RESIDENCE TO FELDMAN'S HISTORIC DISTRICT.
A NEW BUILDING FOR CLASSROOMS WILL BE ADDED ON THE WEST PORTION OF THE LOT. THE BUILDING WILL BE WOOD FRAMED STUCCO WITH BOTH BUILT-UP ROOF AND STANDING SEAM METAL ROOF. PARKING WILL BE PROVIDED ON THE WEST SIDE OF THE LOT.
Total Outstanding Inspections - 10
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/23/2024 | Verify required native plant protection, relocation, removal is completed prior to activity on job site | N/A | Not Applicable | |
| 01/23/2024 | NPPO Pre-Construction | N/A | Not Applicable | |
| 01/23/2024 | PDSD Site/Engineering Division - NPPO | N/A | Not Applicable | There are no native plants on this site |
| 01/23/2024 | SITE - SWPPP Correction Notice | N/A | Not Applicable | |
| 01/23/2024 | SITE - SWPPP Violation Notice | N/A | Not Applicable | |
| 04/04/2024 | SITE - Zoning Violation | N/A | Not Applicable | |
| 03/14/2024 | ENGR - Drainage Structures | N/A | Partial Pass | . |
| 01/23/2024 | PDSD Site/Engineering Division - Landscaping | N/A | Not Ready | Depress landscape areas as noted on plan |
| 08/01/2024 | COT - ENGR - Signage Final | N/A | Partial Pass | Need a van accessible sign and the parking space need to be increased to 11'. Ramp,has to be possibly redone as there are 2 different pitches. |
| 08/01/2024 | ENGR Engineering Final | N/A | Not Ready | Work still in progress and rail at staircase is needed and possible ramp needs to be redone. As per issues with the rail and ADA ramp. if it is needed or being asked for to leave as is with 2 different pitches and the hand rail not being completed to the bottom of ramp due to being over the 5% allowed then this needs to be reflected in the plans as an as built and sent in for review and approval. |
Completed Inspections
Permit Status: Complete
Permit Number: TD-DEV-1023-00417
Permit Description: THE MONTESSORI SCHOOLHOUSE PLANS TO CHANGE THE EXISTING USE OF THE SINGLE FAMILY RESIDENCE TO OFFICES FOR THEIR CHARTER MIDDLE SCHOOL. THE EXISTING TOILETS IN THE BEDROOMS WILL BE DEMOLISHED. ONE NEW ADA RESTROOMS WILL BE LOCATED IN THE EXISTING TOILET AREA. A RAMP TO PROVIDE ADA ACCESS WILL BE PROVIDED ON THE WEST ELEVATION OF THE MAIN RESIDENCE.
NO CHANGES WILL BE MADE TO THE ELEVATIONS VISIBLE FROM 6TH AVE TO ALLOW THE STRUCTURE TO REMAIN AS A CONTRIBUTING RESIDENCE TO FELDMAN'S HISTORIC DISTRICT.
A NEW BUILDING FOR CLASSROOMS WILL BE ADDED ON THE WEST PORTION OF THE LOT. THE BUILDING WILL BE WOOD FRAMED STUCCO WITH BOTH BUILT-UP ROOF AND STANDING SEAM METAL ROOF. PARKING WILL BE PROVIDED ON THE WEST SIDE OF THE LOT.
Total Completed Inspections - 17