Inspection History Details
Inspection Status: Partial Pass
Inspection History: SITE - Stormwater Follow-up
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/25/2024 | SITE - Stormwater Follow-up | Partial Pass | ||
| 03/14/2024 | SITE - Stormwater Follow-up | Partial Pass | ||
| 04/05/2024 | SITE - Stormwater Follow-up | Partial Pass | ||
| 06/18/2024 | SITE - Stormwater Follow-up | Partial Pass | ||
| 06/20/2024 | SITE - Stormwater Follow-up | Partial Pass | contain all materials on job site. | |
| 07/30/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | No concerns at this time | |
| 08/01/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | In walking the stormwater I noticed several items in railings. One at the staircase there is a section between rails that is over 18'. Second is at the ADA parking space there is a section of ramp that has two different pitches, one being 5.9 the other being 5.1. All stormwater looks good. |
|
| 08/12/2024 | SITE - Stormwater Follow-up | Passed |