Permit: TD-DEV-0925-00234
Permit Details
Apply Date:
09/08/2025
Applicant:
Arthur Schlegel
Description:
Rev 3 - Update to west side path, NW & SW bollards, started 06.25.2026 Rev 2 - update to water basins, curb line, slab, started 01.23.2026 ** Rev 1 - Started 12.10.2025, update to downspout locations ** Minor Development Package for added square footage to building, no additional site work.
Permit Reviews
Permit Number - TD-DEV-0925-00234
Permit Status: Complete
Permit Description: Rev 3 - Update to west side path, NW & SW bollards, started 06.25.2026
Rev 2 - update to water basins, curb line, slab, started 01.23.2026 ** Rev 1 - Started 12.10.2025, update to downspout locations ** Minor Development Package for added square footage to building, no additional site work.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/10/2026 | DEVELOPMENT PACKAGE NEW REVISION v.2 | 07/13/2026 | APPROVED |
| 09/18/2025 | DEVELOPMENT PACKAGE NEW v.2 | 10/24/2025 | REQUIRES RESUBMIT |
| 01/23/2026 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 02/06/2026 | REQUIRES RESUBMIT |
| 06/25/2026 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 07/07/2026 | REQUIRES RESUBMIT |
| 10/31/2025 | DEVELOPMENT PACKAGE NEW v.3 | 11/13/2025 | REQUIRES RESUBMIT |
| 12/10/2025 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 12/15/2025 | APPROVED |
| 02/09/2026 | DEVELOPMENT PACKAGE NEW REVISION v.2 | 02/09/2026 | APPROVED |
| 09/09/2025 | DEVELOPMENT PACKAGE NEW v.1 | 09/12/2025 | REQUIRES RESUBMIT |
| 12/01/2025 | DEVELOPMENT PACKAGE NEW v.5 | 12/02/2025 | APPROVED |
| 07/17/2026 | AS-BUILT v.1 | N/A | APPROVED |
| 11/14/2025 | DEVELOPMENT PACKAGE NEW v.4 | 11/21/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TD-DEV-0925-00234
Permit Status: Complete
Permit Description: Rev 3 - Update to west side path, NW & SW bollards, started 06.25.2026
Rev 2 - update to water basins, curb line, slab, started 01.23.2026 ** Rev 1 - Started 12.10.2025, update to downspout locations ** Minor Development Package for added square footage to building, no additional site work.
| Date | Description | Comments |
|---|---|---|
| 07/14/2026 | Prior to final - needs review for requests for information, AS-Built will need to be submitted |
Outstanding Inspections
Permit Status: Complete
Permit Number: TD-DEV-0925-00234
Permite Description: Rev 3 - Update to west side path, NW & SW bollards, started 06.25.2026
Rev 2 - update to water basins, curb line, slab, started 01.23.2026 ** Rev 1 - Started 12.10.2025, update to downspout locations ** Minor Development Package for added square footage to building, no additional site work.
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/09/2026 | N/A | Not Ready | Scupper tread plates were built too short and need to be rebuilt. Reschedule when ready. | |
| 06/03/2026 | Final inspection to ensure all landscape and water harvesting SITE | N/A | Partial Pass | 6/3/26 Basin 1 correct-except- Outlet Weir of Basin 1 next to/onto Ganley Rd. It is not clearly drawn to show what the intention of where water should go after it crosses weir. Looks like it will go down to ditch along road. Shouldn't this area should have riprap to prevent erosion? |
Completed Inspections
Permit Status: Complete
Permit Number: TD-DEV-0925-00234
Permit Description: Rev 3 - Update to west side path, NW & SW bollards, started 06.25.2026
Rev 2 - update to water basins, curb line, slab, started 01.23.2026 ** Rev 1 - Started 12.10.2025, update to downspout locations ** Minor Development Package for added square footage to building, no additional site work.
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/11/2026 | PDSD Engineering Division Pre-Construction SITE | Passed | 2/10/26 Grading inspection- Request when ready before hydroseeding basin/graded areas. Request flatwork/sidewalk inspection before you pour scuppers. Request Engineering inspection when finished |
|
| 06/03/2026 | Passed | 7/3/26 Striping per plan around new edition. | ||
| 06/15/2026 | SITE - Zoning Final | Passed | ||
| 08/12/2026 | Passed | |||
| 07/14/2026 | ENGR Engineering Final | Passed | Striped area west of new addition is not to plan (Less than 9'-5"). There is one bollard instead of two at each corner. The sidewalk that the site plan shows in the north corner between the existing building and the new addition is not poured. Build these to plan or submit As-Built showing changes for review. | |
| 07/14/2026 | Final inspection to ensure all landscape and water harvesting SITE | Passed |