Permit: TD-DEV-0923-00388
Permit Details
Status:
Complete
Type:
Development Package
Address:
4995 N CASA GRANDE HY
Address NEW:
4995 N CASA GRANDE HY
Apply Date:
09/07/2023
Applicant:
Alicia Cologgi
Description:
As build submittal submitted on *Revision #1 started 3/1/24* Site plan work to accompany the building permit submittal: TC-COM-0923-02153
Permit Reviews
Permit Number - TD-DEV-0923-00388
Permit Status: Complete
Permit Description: As build submittal submitted on *Revision #1 started 3/1/24* Site plan work to accompany the building permit submittal: TC-COM-0923-02153
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/25/2024 | DEVELOPMENT PACKAGE NEW v.2 | 05/14/2024 | APPROVED |
| 04/11/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/14/2025 | APPROVED |
| 09/07/2023 | DEVELOPMENT PACKAGE NEW v.1 | 09/15/2023 | REQUIRES RESUBMIT |
| 11/09/2023 | DEVELOPMENT PACKAGE NEW v.3 | 12/14/2023 | REQUIRES RESUBMIT |
| 03/01/2024 | DEVELOPMENT PACKAGE NEW v.1 | 04/18/2024 | REQUIRES RESUBMIT |
| 12/15/2023 | DEVELOPMENT PACKAGE NEW v.4 | 12/27/2023 | APPROVED |
| 04/16/2025 | AS-BUILT v.1 | 04/17/2025 | APPROVED |
| 01/08/2025 | DEVELOPMENT PACKAGE NEW REVISION v.3 | 01/31/2025 | REQUIRES RESUBMIT |
| 11/13/2024 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 11/13/2024 | REQUIRES RESUBMIT |
| 11/19/2024 | DEVELOPMENT PACKAGE NEW REVISION v.2 | 12/23/2024 | REQUIRES RESUBMIT |
| 02/13/2025 | DEVELOPMENT PACKAGE NEW REVISION v.4 | 02/19/2025 | APPROVED |
| 09/27/2023 | DEVELOPMENT PACKAGE NEW v.2 | 10/26/2023 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Complete
Permit Number: TD-DEV-0923-00388
Permite Description: As build submittal submitted on *Revision #1 started 3/1/24* Site plan work to accompany the building permit submittal: TC-COM-0923-02153
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/16/2024 | COT - SITE - Zoning Intermediate | N/A | Partial Pass | Contractor, good to pour the floor for the fueling station |
| 01/17/2025 | Consultation SITE | N/A | Partial Pass | Discussed outlet details at NW basin. will review plans and drainage report for elevation solutions |
| 01/30/2025 | ENGR - Drainage Structures | N/A | Partial Pass | Contractor can pour the footings for the trash enclosure |
| 11/25/2024 | N/A | Partial Pass | Contractor is good to lay pipe going east and one going south |
Completed Inspections
Permit Status: Complete
Permit Number: TD-DEV-0923-00388
Permit Description: As build submittal submitted on *Revision #1 started 3/1/24* Site plan work to accompany the building permit submittal: TC-COM-0923-02153
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/06/2024 | PDSD Engineering Division Pre-Construction SITE | Passed | For the contractor to call in every two weeks for the swept and call in for inspections of the pipe being laid | |
| 03/12/2025 | ENGR - Drainage Structures | Passed | ||
| 03/12/2025 | Passed | |||
| 04/17/2025 | ENGR Engineering Final | Passed |