Inspection Status: Partial Pass
Inspection History
| Date |
Description |
Inspector |
Results |
Comments |
| 02/26/2025 |
|
|
Partial Pass |
Contractor is good to pour the footer for the head wall on the west side of the project |
| 03/12/2025 |
|
|
Passed |
|
| 11/15/2024 |
|
|
Partial Pass |
Bedded acceptable. ready to cover with additional sand cover prior to actual backfill. |
| 11/20/2024 |
|
|
Partial Pass |
contractor back storm drain pipe. Josh Garcia OK to backfill with bedding material on top of the pipe 1 foot and then continue to backfill with native material |
| 11/22/2024 |
|
|
Partial Pass |
okay to backfill E-W run of pipe. |
| 11/25/2024 |
|
|
Partial Pass |
Contractor is good to lay pipe going east and one going south |
| 12/03/2024 |
|
|
Partial Pass |
Contractors installing 12” x 52’ of HD pipe on the north west corner of the project. Good to backfill. |