Permit: TD-DEV-0923-00385
Permit Details
Apply Date:
09/01/2023
Applicant:
Alicia Simmons
Description:
Rev 1 - submitted 10.23.2025 - Update to landscaping, doorways ** New Buildings, parking and landscape for Teen Challenge.
Permit Reviews
Permit Number - TD-DEV-0923-00385
Permit Status: Issued
Permit Description: Rev 1 - submitted 10.23.2025 - Update to landscaping, doorways ** New Buildings, parking and landscape for Teen Challenge.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/06/2023 | DEVELOPMENT PACKAGE NEW v.1 | 10/19/2023 | REQUIRES RESUBMIT |
| 01/19/2024 | DEVELOPMENT PACKAGE NEW v.3 | 01/25/2024 | APPROVED |
| 10/23/2025 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 11/24/2025 | APPROVED |
| 11/22/2023 | DEVELOPMENT PACKAGE NEW v.2 | 01/04/2024 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Issued
Permit Number: TD-DEV-0923-00385
Permite Description: Rev 1 - submitted 10.23.2025 - Update to landscaping, doorways ** New Buildings, parking and landscape for Teen Challenge.
Total Outstanding Inspections - 9
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/12/2025 | N/A | Not Applicable | Contractor is pouring ROW sidewalk. I talked to him on phone about inspections he will need to request. | |
| 02/18/2026 | N/A | Partial Pass | Irrigation installation progress is good. Main lines are in place, dedicated meter is set up, lateral lines are being run. | |
| 03/23/2026 | ENGR Paving | N/A | Not Ready | The subgrade on the south east entrance has not been completed yet. The trash bins are still on site. They need to be removed. Just north of that the AB grade needs to be tied up a bit and remove some oil spills and gasoline spills on that AB. |
| 12/23/2025 | Grading Progress ENGR | N/A | Partial Pass | Contractor just started grading the parking lot area on the Oracle roadside. Continue grading. |
| 10/03/2025 | For trash and recycling enclosures | N/A | Partial Pass | Reinforcement is good, depth is good, slope is accurate - slab is formed per plans; okay to pour. |
| 12/16/2025 | N/A | Partial Pass | Contractor can pour for on-site sign footer | |
| 12/30/2025 | N/A | Partial Pass | Contractor, good to backfill the storm drain pipe along Oracle Road. Contractor also cap the existing 30 inch RCP pipe that is abandoned. | |
| 01/09/2026 | ENGR - Drainage Structures | N/A | Partial Pass | Infiltration chambers along Oracle Rd, two sections immediately north of southern entrance, 10 chambers total: These are set correctly and pvc connection pipe is in place. Okay to backfill. |
| 12/11/2024 | Consultation SITE | N/A | Partial Pass | I informed the contractor he need to call every two weeks for swap inspections grading, rebar inspections, so on so forth with the engineering department |
Completed Inspections
Permit Status: Issued
Permit Number: TD-DEV-0923-00385
Permit Description: Rev 1 - submitted 10.23.2025 - Update to landscaping, doorways ** New Buildings, parking and landscape for Teen Challenge.
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/04/2025 | PDSD Engineering Division Pre-Construction SITE | Passed | Contractor called in for the wrong inspection contractor needed an 8 inch HDP pipe or stormwater everything’s good and inform the contractor that I need compaction test on the backfield | |
| 03/25/2026 | For trash and recycling enclosures | Passed | ||
| 03/25/2026 | Passed | |||
| 03/25/2026 | Passed | |||
| 03/25/2026 | ENGR - Drainage Structures | Passed |