Inspection Status: Partial Pass
Inspection History: ENGR - Drainage Structures
| Date |
Description |
Inspector |
Results |
Comments |
| 01/09/2026 |
ENGR - Drainage Structures |
|
Partial Pass |
Infiltration chambers along Oracle Rd, two sections immediately north of southern entrance, 10 chambers total: These are set correctly and pvc connection pipe is in place. Okay to backfill. |
| 02/05/2026 |
ENGR - Drainage Structures |
|
Passed |
Contractor, good to backfill storm drain on the on the southwest side |
| 02/20/2026 |
ENGR - Drainage Structures |
|
Partial Pass |
Final infiltration chamber: okay to backfill. |
| 03/25/2026 |
ENGR - Drainage Structures |
|
Passed |
|
| 10/10/2025 |
ENGR - Drainage Structures |
|
Partial Pass |
Courtesy inspection. commented on temporary wattle across gate for potential weekend rain. |
| 12/23/2025 |
ENGR - Drainage Structures |
|
Partial Pass |
Contractor has a storm drain pipe on the worker roadside. It’s good to backfill part of the pipe. There is an existing RCP pipe that they cut out that needs to be capped before backfilling all that storm drain. |
| 12/29/2025 |
ENGR - Drainage Structures |
|
Not Ready |
Contractor needs to cap the old existing RCP pipe running into the job site off of Oracle. |