Inspection Status: Partial Pass
Inspection History
| Date |
Description |
Inspector |
Results |
Comments |
| 01/09/2026 |
|
|
Partial Pass |
Walls on east side of Bldg 4 and monument base are good to grout final lift. |
| 01/27/2026 |
|
|
Partial Pass |
Doctor good to grout, retaining wall in the middle of the project |
| 01/30/2026 |
|
|
Partial Pass |
Final planter box and small retaining wall south of boxes are good to grout. |
| 02/24/2026 |
|
|
Partial Pass |
Contractors good to pour the footer for the wall in between the two buildings on the south closest to Oracle Road |
| 03/25/2026 |
|
|
Passed |
|
| 09/22/2025 |
|
|
Partial Pass |
Contractor Ken light block on the retaining wall on the east side of the building |
| 12/16/2025 |
|
|
Partial Pass |
Contractor can pour for on-site sign footer |