Inspection Status: Partial Pass
Inspection History: Consultation SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 01/09/2025 |
Consultation SITE |
|
Partial Pass |
Contractors good to backfill that Aiden sewer line on the property. Contractor needs cleanup the concrete slurry where the concrete truck dumps out the concrete on the east side of the. |
| 01/30/2025 |
Consultation SITE |
|
Passed |
Contractors installing an 8 inch HDP on the south end of the building they need to remove the 8 inch pipe and install bedding underneath it and have 8 inches between the bank and the pipe on both sides |
| 03/10/2026 |
Consultation SITE |
|
Partial Pass |
I went ahead and informed the contractor to go ahead and panel around the canopies in front of building one. But I also informed him that belongs to the building inspector. |
| 03/26/2026 |
Consultation SITE |
|
Partial Pass |
Building four it’s good for TCO level two |
| 04/10/2025 |
Consultation SITE |
|
Partial Pass |
From the contractor he needed to put wattles around the spoil pile |
| 12/10/2024 |
Consultation SITE |
|
Partial Pass |
I informed the contractor he need to call every two weeks for swap inspections grading, rebar inspections, so on so forth with the engineering department |