Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
8284 S CAMINO DE CAFE
Apply Date:
07/08/2024
Applicant:
Chris Guinter
Description:
New building with parking and landscaping improvements

Permit Reviews

Permit Number - TD-DEV-0724-00196
Permit Status: Complete
Permit Description: New building with parking and landscaping improvements
Start Date Submittal Complete Date Status  
11/25/2024 DEVELOPMENT PACKAGE NEW v.3 02/24/2025 APPROVED Review Details
07/11/2024 DEVELOPMENT PACKAGE NEW v.1 08/29/2024 REQUIRES RESUBMIT Review Details
10/03/2024 DEVELOPMENT PACKAGE NEW v.2 11/07/2024 REQUIRES RESUBMIT Review Details
06/03/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/04/2026 APPROVED Review Details

Conditions

Permit Number - TD-DEV-0724-00196
Permit Status: Complete
Permit Description: New building with parking and landscaping improvements
Date Description Comments
10/02/2025 CRWHPLAN NEEDS TO BE CREATED PRIOR TO CLOSEOUT

Outstanding Inspections

Permit Status: Complete
Permit Number: TD-DEV-0724-00196
Permite Description: New building with parking and landscaping improvements
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
07/29/2026 N/A Partial Pass Okay to grout first lift.

Completed Inspections

Permit Status: Complete
Permit Number: TD-DEV-0724-00196
Permit Description: New building with parking and landscaping improvements
Total Completed Inspections - 12
Date Description Inspector Results Comments
03/21/2025 PDSD Engineering Division Pre-Construction SITE Passed See inspection checklist.
05/20/2025 NPPO Pre-Construction Passed PIP # 1 & 2 accounted for. #1 will be replaced and #2 TOS. Nursery in place. See checklist items for details.
06/22/2026 Passed Rough Grading is good. Retaining wall footer will need to be cut in on South edge of parking area from the corner of the Refuse Enclosure to the East to where it will be retaining less than 3'. Wall Detail has been submitted and approved. Retaining wall will also be needed at North side of parking area around the transformer where it will be too steep for grouted rip rap. Areas west/south of building are correct.
Also the Basin at the street needs to be dug deeper at the south end so that the bottom is flat as it is drawn in grading sheet. Currently it tapers up to the south, following the grade of the sidewalk. Riprap will be grouted where necessary. North of building is ready for grouted riprap as well as other areas on plan where retaining wall is not necessary. Okay to proceed with retaining walls.
Schedule Grading Progress inspection when basin is correct, and Final when curbs and walls are in place, backfilled and subgrade and fill is compacted and ready for AB.
Schedule wall inspections when wall footers are ready.
09/08/2026 Passed
09/08/2026 LAND Landscape Appearance & Function Final Passed
09/11/2026 ENGR Paving Passed
09/11/2026 For trash and recycling enclosures Passed
09/11/2026 Passed
09/11/2026 Passed
09/25/2026 ENGR Engineering Final Passed
09/25/2026 COT - ENGR - Signage Final Passed
09/25/2026 SITE - Zoning Final Passed

Documents

File Name Document Type  
TD-DEV-0724-00196 RITA RANCH LOT 26 - REV 1 LETTER-M1_V1.PDF DOCUMENTS VIEW
RETAINING WALL DETAIL 8284 CAMINO DE CAFE_V1.PDF DOCUMENTS VIEW
APPROVDE PLAN SET TD-DEV-0724-00196 - BROWN-RITA LOT 26 - DP 02_V2.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
TD-DEV-0724-00196 RITA RANCH LOT 26 - DP03_V3.PDF DOCUMENTS VIEW