Inspection Status: Partial Pass
Inspection History
| Date |
Description |
Inspector |
Results |
Comments |
| 07/07/2026 |
|
|
Partial Pass |
Footer dimensions and reinforcing correct to plan. Ok to pour footer. Place the 1” pvc at 5’ OC weeps, gravel and asphaltic waterproofing before backfilling, so we can see it. Place #4 bond beam at top of retained grade and schedule pregrout inspection for full grout to bond beam when ready. |
| 07/29/2026 |
|
|
Partial Pass |
Okay to grout first lift. |
| 09/08/2026 |
|
|
Passed |
|