Inspection Status: Partial Pass

Inspection History

Date Description Inspector Results Comments
07/07/2026 Partial Pass Footer dimensions and reinforcing correct to plan. Ok to pour footer. Place the 1” pvc at 5’ OC weeps, gravel and asphaltic waterproofing before backfilling, so we can see it. Place #4 bond beam at top of retained grade and schedule pregrout inspection for full grout to bond beam when ready.
07/29/2026 Partial Pass Okay to grout first lift.
09/08/2026 Passed