Inspection History Details
Inspection Status: Passed
Inspection History
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/22/2026 | Passed | Rough Grading is good. Retaining wall footer will need to be cut in on South edge of parking area from the corner of the Refuse Enclosure to the East to where it will be retaining less than 3'. Wall Detail has been submitted and approved. Retaining wall will also be needed at North side of parking area around the transformer where it will be too steep for grouted rip rap. Areas west/south of building are correct. Also the Basin at the street needs to be dug deeper at the south end so that the bottom is flat as it is drawn in grading sheet. Currently it tapers up to the south, following the grade of the sidewalk. Riprap will be grouted where necessary. North of building is ready for grouted riprap as well as other areas on plan where retaining wall is not necessary. Okay to proceed with retaining walls. Schedule Grading Progress inspection when basin is correct, and Final when curbs and walls are in place, backfilled and subgrade and fill is compacted and ready for AB. Schedule wall inspections when wall footers are ready. |