Permit: TD-DEV-0625-00156
Permit Details
Status:
Complete
Type:
Development Package
Address:
4697 S CAMPBELL AV
Address NEW:
4697 S CAMPBELL AV
Apply Date:
06/06/2025
Applicant:
Austin Hodges
Description:
Restricted record - New construction bank location and associated site work.
Permit Reviews
Permit Number - TD-DEV-0625-00156
Permit Status: Complete
Permit Description: Restricted record - New construction bank location and associated site work.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/12/2025 | DEVELOPMENT PACKAGE NEW v.2 | 09/12/2025 | REQUIRES RESUBMIT |
| 06/09/2025 | DEVELOPMENT PACKAGE NEW v.1 | 07/18/2025 | REQUIRES RESUBMIT |
| 10/16/2025 | DEVELOPMENT PACKAGE NEW v.3 | 11/14/2025 | APPROVED |
Conditions
Permit Number - TD-DEV-0625-00156
Permit Status: Complete
Permit Description: Restricted record - New construction bank location and associated site work.
| Date | Description | Comments |
|---|---|---|
| 11/06/2025 | CRWHPLAN NEEDS TO BE CREATED PRIOR TO CLOSEOUT |
Outstanding Inspections
Permit Status: Complete
Permit Number: TD-DEV-0625-00156
Permite Description: Restricted record - New construction bank location and associated site work.
Total Outstanding Inspections - 2
Completed Inspections
Permit Status: Complete
Permit Number: TD-DEV-0625-00156
Permit Description: Restricted record - New construction bank location and associated site work.
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/06/2026 | PDSD Engineering Division Pre-Construction SITE | Passed | ||
| 06/08/2026 | Passed | contractors still working on the grading for aggregate base. Contract is good to pour the catch basin over by the basin area. | ||
| 06/25/2026 | Grading Progress ENGR | Passed | Site walk to check on overall condition and identify any issues. Sidewalks and flatwork slopes are within required tolerances. ADA parking slopes are within required tolerances. Ensure bottom of signs are 7 feet above sidewalk surface. Irrigation laterals should be trenched to 18 inches deep. Landscape areas should be depressed up to 6 inches. (Except within 10 feet of building foundation) Basin outlet structures and downspout splash pads not yet installed. Southeast corner of building needs to have positive drainage away from the building. Rainwater basins need to be free of standing water by 24 hours following a rain event. Refuse enclosure needs a method to secure the doors in the open position. |
|
| 07/07/2026 | Passed | |||
| 07/07/2026 | Passed | |||
| 07/15/2026 | For trash and recycling enclosures | Passed | ||
| 07/15/2026 | ENGR Engineering Final | Passed |