Permit: TD-DEV-0625-00156

Parcel: 132191010


Addresses:

4697 S CAMPBELL AV

Inspection Status: Partial Pass

Inspection History

Date Description Inspector Results Comments
04/02/2026 Partial Pass good to pour the footer for the trash enclosure contractor juicy number five bar instead of the number four bar, which is OK with us
04/07/2026 Partial Pass contractor is good to pour carbon gutter on the west side of the parking lot
04/08/2026 Partial Pass The contractor is good to pour the curb on the west side and on the north side
04/28/2026 Partial Pass Sidewalk 4' and 6' NE of building from ROW to crosswalks across drive through and to curb ramp to Refuse Enclosures. Okay to pour this sidewalk. 4' sidewalk curb ramp to RE not ready yet, Curbs not poured.
04/30/2026 Partial Pass good to pour the curb and gutter through the drive-through area and the vertical curve by the dumpster
05/06/2026 Partial Pass Sidewalk forms, SW ramp from ROW to drive through lane: Uppermost panel before drive crossing is over 5% on one side, needs to be under 5%. Top of ramp where sidewalk turns 90 degrees towards drive is over 2%, needs to be under 2% in all directions. Main ramp is at about 4%, so there should be plenty room to correct these two panels. Okay to pour after corrections are made.

Sidewalk forms, area in front of main entrance between drive through lanes: layout, subgrade, and slopes are good. Okay to pour.

Sidewalk forms, NE of drive through lane on Missouri St side, 2 panels closest to drive: layout, subgrade, and slopes are good. Okay to pour.
07/07/2026 Passed