Inspection Status: Partial Pass
Inspection History: For trash and recycling enclosures
| Date |
Description |
Inspector |
Results |
Comments |
| 04/02/2026 |
For trash and recycling enclosures |
|
Partial Pass |
trash enclosure footer is good to pour contractors. Use the number five bar, which is good for us plans call for number four. |
| 04/14/2026 |
For trash and recycling enclosures |
|
Partial Pass |
contract is good to grout the walls for the trash enclosure |
| 05/12/2026 |
For trash and recycling enclosures |
|
Not Ready |
The rebar for the steel is not in place yet the contractor that installing the rebar for the floor for the trash enclosure is not on site |
| 05/13/2026 |
For trash and recycling enclosures |
|
Partial Pass |
okay to pour the floor for trash enclosure |
| 07/08/2026 |
For trash and recycling enclosures |
|
Not Ready |
|
| 07/15/2026 |
For trash and recycling enclosures |
|
Passed |
|