Permit: TD-DEV-0624-00169
Permit Details
Status:
Complete
Type:
Development Package
Address:
6105 E BROADWAY BL
Address NEW:
6105 E BROADWAY BL
Apply Date:
06/03/2024
Applicant:
John Morgan
Description:
Revision 1 - New McDonald's site and building
Permit Reviews
Permit Number - TD-DEV-0624-00169
Permit Status: Complete
Permit Description: Revision 1 - New McDonald's site and building
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/15/2025 | AS-BUILT v.1 | 07/24/2025 | APPROVED |
| 06/14/2024 | DEVELOPMENT PACKAGE NEW v.2 | 08/05/2024 | REQUIRES RESUBMIT |
| 12/26/2024 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 01/21/2025 | REQUIRES RESUBMIT |
| 10/18/2024 | DEVELOPMENT PACKAGE NEW v.4 | 12/24/2024 | APPROVED |
| 02/19/2025 | DEVELOPMENT PACKAGE NEW REVISION v.3 | 02/26/2025 | APPROVED |
| 08/29/2024 | DEVELOPMENT PACKAGE NEW v.3 | 10/03/2024 | REQUIRES RESUBMIT |
| 02/03/2025 | DEVELOPMENT PACKAGE NEW REVISION v.2 | 02/19/2025 | REQUIRES RESUBMIT |
| 06/06/2024 | DEVELOPMENT PACKAGE NEW v.1 | 06/13/2024 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Complete
Permit Number: TD-DEV-0624-00169
Permite Description: Revision 1 - New McDonald's site and building
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/10/2025 | For trash and recycling enclosures | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: TD-DEV-0624-00169
Permit Description: Revision 1 - New McDonald's site and building
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/11/2025 | PDSD Engineering Division Pre-Construction SITE | Passed | Informed the contractor he needed to have all the third-party testing on site to install wattles all along the fence line and track out rock at the entrance of the project | |
| 06/27/2025 | For trash and recycling enclosures | Passed | 6/27/25 Both Refuse Enclosures built not to TSM Section 8 standards but are built per COT Approved Plans- Except wall height and gate height are over 6’. They stand at 7.5’ This discrepancy will need to be submitted in as built. Gates are primed but need to be painted “Iron Ore”. Painting scheduled for June 30. | |
| 07/01/2025 | LAND Landscape Appearance & Function Final | Passed | Contractor will replace 3 missing or dead lantanas and 2 yuccas in East Parking Area Landscape as discussed. Irrigation function and Landscape appearance is met as intended. Details are correct. South of the building is an area outside of the landscape scope that had preexisting plants that will be mitigated with new plants. Irrigation in this area functions. Matching Dg will be placed in this area. Another Area NW of the building also needs to have Dg. This DG will be depressed as discussed with Contractor. Both of these areas will be checked at engineering final. |
|
| 07/01/2025 | Passed | 7/1/25 Okay for level 4 TCO. Contractor widened NW curb cut to match plans. The rest of the curb cuts were accepted by the engineer of record as sufficient to function as intended. The Sidewalk scupper noted earlier was unintended and also accepted by the engineer. These changes will be noted in the as builts. The long term and short term bike parking will be fastened down correctly by the Engineering Final. The Parking area on top of Alamo Wash has been sealed with a surface restoration coating. It is setting up and the area is roped off from the public. There is sufficient access while this area is roped off. This area will be Striped Wednesday night 7/2/25. I will check details in this Area at Engineering Final. All construction debris and Material will be off site by end of day. Unfinished areas will be cordoned or fenced off and public safety will be maintained. Access will not be limited except in Alamo Wash area. Schedule Engineering Final when Alamo Wash and Landscaping issues completed. |
||
| 07/01/2025 | Passed | 7/1/25 All Bollards have been filled. The remaining unpainted bollards on retaining wall are being painted per PAG 106 now. | ||
| 07/08/2025 | SITE - Zoning Final | Passed | ||
| 08/01/2025 | ENGR Engineering Final | Passed | Alamo Wash area complete. |