Inspection History Details
Inspection Status: Not Ready
Inspection History: For trash and recycling enclosures
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/10/2025 | For trash and recycling enclosures | Not Ready | ||
| 06/10/2025 | For trash and recycling enclosures | Not Ready | ||
| 06/11/2025 | For trash and recycling enclosures | Partial Pass | Apron okay to pour when 3rd party compaction compliance received by COT See checklist items. |
|
| 06/11/2025 | For trash and recycling enclosures | Partial Pass | Apron okay to pour when 3rd party compaction compliance received by COT See checklist items. |
|
| 06/20/2025 | For trash and recycling enclosures | Partial Pass | Aprons poured on both enclosures and complies. Call in final inspection when gates installed | |
| 06/20/2025 | For trash and recycling enclosures | Partial Pass | Aprons poured on both enclosures and complies. Call in final inspection when gates installed. | |
| 06/27/2025 | For trash and recycling enclosures | Passed | 6/27/25 Both Refuse Enclosures built not to TSM Section 8 standards but are built per COT Approved Plans- Except wall height and gate height are over 6’. They stand at 7.5’ This discrepancy will need to be submitted in as built. Gates are primed but need to be painted “Iron Ore”. Painting scheduled for June 30. | |
| 06/27/2025 | For trash and recycling enclosures | Passed | 6/27/25 Both Refuse Enclosures built not to TSM Section 8 standards but are built per COT Approved Plans- Except wall height and gate height are over 6’. They stand at 7.5’ This discrepancy will need to be submitted in as built. Gates are primed but need to be painted “Iron Ore”. Painting scheduled for June 30. |