Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/08/2025 | ENGR Engineering Final | Partial Pass | 7/8/25 Bike parking in. Landscaping items and dg complete. Striping on Alamo Wash south section complete. Touch up on coating and final section of top coating including striping to the north section of Alamo Wash will be completed as soon as the rest of material is available. Joint between existing concrete at Alamo Wash and new paving to be caulked. Okay for full C of O. As-Built set of plans required prior to final and DP close out. Should these not be provided, C of O will be rescinded. |
|
| 08/01/2025 | ENGR Engineering Final | Passed | Alamo Wash area complete. |