Permit: TD-DEV-0425-00097
Permit Details
Status:
In Review
Type:
Development Package
Address:
8825 E TANQUE VERDE RD
Address NEW:
8825 E TANQUE VERDE RD
Apply Date:
04/03/2025
Applicant:
Andrew Diller
Description:
Development package for a new carwash. Zoning amendment TP-AMD-0124-0001.
Permit Reviews
Permit Number - TD-DEV-0425-00097
Permit Status: In review
Permit Description: Development package for a new carwash. Zoning amendment TP-AMD-0124-0001.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/08/2025 | DEVELOPMENT PACKAGE NEW v.5 | 10/16/2025 | REQUIRES RESUBMIT |
| 06/23/2025 | DEVELOPMENT PACKAGE NEW v.4 | 07/21/2025 | REQUIRES RESUBMIT |
| 11/06/2025 | DEVELOPMENT PACKAGE NEW v.6 | 11/12/2025 | REQUIRES RESUBMIT |
| 04/07/2025 | DEVELOPMENT PACKAGE NEW v.1 | 04/11/2025 | REQUIRES RESUBMIT |
| 04/21/2025 | DEVELOPMENT PACKAGE NEW v.2 | 05/28/2025 | REQUIRES RESUBMIT |
| 11/14/2025 | DEVELOPMENT PACKAGE NEW v.7 | 11/19/2025 | APPROVED |
| 06/18/2025 | DEVELOPMENT PACKAGE NEW v.3 | 06/18/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TD-DEV-0425-00097
Permit Status: In review
Permit Description: Development package for a new carwash. Zoning amendment TP-AMD-0124-0001.
| Date | Description | Comments |
|---|---|---|
| 11/14/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 11/14/2025 | Dust Control/Air Quality Permit is Required. (Utilized with DP's & TP's) |
Outstanding Inspections
Permit Status: In Review
Permit Number: TD-DEV-0425-00097
Permite Description: Development package for a new carwash. Zoning amendment TP-AMD-0124-0001.
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2026 | Consultation SITE | N/A | Partial Pass | Discussed construction sequences and requirements. |
| 11/13/2026 | COT - BASN - Drainage/Basin - Condition Inspection | N/A | Not Ready | Basin looks correct. Okay to start placing approved slope treatments. Outlet structure/weir not built per plan. this will need to be approved. Detail 14 page 10 on DP shows either the top of the weir or bottom is 3” high. |
| 11/03/2026 | ENGR Paving | N/A | Partial Pass | PCCP prep north of building under and east of canopy is correct. Send pictures of reinforcing dobies in place. Okay to pour. |
| 10/27/2026 | N/A | Partial Pass | checked ramp at south east - corrected from Saturday. | |
| COT - FCON - Fire - Final | N/A | Requested |
Completed Inspections
Permit Status: In Review
Permit Number: TD-DEV-0425-00097
Permit Description: Development package for a new carwash. Zoning amendment TP-AMD-0124-0001.
Total Completed Inspections - 10
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/28/2026 | NPPO Pre-Construction | Passed | 1. NPPO - 3 transplants to be moved one time into the scenic corridor for required revegetation of that area. 2. Established NPPO nursery location and water source for temporary irrigation. 3. Construction trailer to be placed on site within the scenic corridor where plants have died or are non existent. |
|
| 04/28/2026 | PDSD Engineering Division Pre-Construction SITE | Passed | ||
| 05/15/2026 | SITE - Stormwater Setup and Controls | Passed | Trackout in place. Use large dia rock when refreshing trackout. Protect outlets to north with wattle and rough cut basin before monsoon season begins. | |
| 09/17/2026 | Passed | |||
| 10/23/2026 | For trash and recycling enclosures | Passed | ||
| 10/27/2026 | Passed | |||
| 11/03/2026 | Grading Progress ENGR | Passed | Basin to North is formed and looks good to plan. Ready for Weir/Riprap and landscaping. South of building is good Trench drains w ill be cut into asphalt and sidewalk to ROW subgrade is close to ready... | |
| 11/13/2026 | ENGR Grading Final | Passed | ||
| 11/17/2026 | Passed | Sidewall panel that was too steep just south of curb ramp at SE corner of site is corrected. | ||
| 11/17/2026 | ENGR - Drainage Structures | Passed | Both stages of top of weir at basin A verified to plan. Weir will function as designed. Contractor provided pictures of reinforcing in floor and walls sufficient to accept it. |