| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| ENGR Paving | Requested | |||
| 10/02/2026 | ENGR Paving | Partial Pass | Heavy duty 7" concrete paving at NW of site prep is being done correctly. AB looks good. Reinforcing is per plan and spaced correctly on dobies. Expansion material is in place at curbs. Rebar continues through forms to splice to adjacent slabs. Okay to pour this area pending pictures of completed portion to the south that is not currently ready. Submit compaction tests of AB to the portal. | |
| 10/07/2026 | ENGR Paving | Partial Pass | Large area of 7 inches heavy duty PCCP south of building. Okay to pour Paving. Expansion material in place at cold joints. Send Picures of Dobies being used for correct reinforcing clearance. -Also okay to pour south sidewalk in front of bldg, pending pictures of all Subgrade compacted correctly. Submit compaction results to the portal. |