Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR Paving
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/02/2026 | ENGR Paving | Partial Pass | Heavy duty 7" concrete paving at NW of site prep is being done correctly. AB looks good. Reinforcing is per plan and spaced correctly on dobies. Expansion material is in place at curbs. Rebar continues through forms to splice to adjacent slabs. Okay to pour this area pending pictures of completed portion to the south that is not currently ready. Submit compaction tests of AB to the portal. | |
| 10/07/2026 | ENGR Paving | Partial Pass | Large area of 7 inches heavy duty PCCP south of building. Okay to pour Paving. Expansion material in place at cold joints. Send Picures of Dobies being used for correct reinforcing clearance. -Also okay to pour south sidewalk in front of bldg, pending pictures of all Subgrade compacted correctly. Submit compaction results to the portal. |
|
| 10/14/2026 | ENGR Paving | Partial Pass | Concrete paving west of Refuse Enclosure and vacuum building, including these floors inside. AB good, Reinforcing good, expansion at cold joints good, forms and depth good. Okay to pour this section. | |
| 10/24/2026 | ENGR Paving | Partial Pass | 10/24/26 7" PCCP on east side of main parking areas south of building and 3 curb ramps- Trench drain is precast and differs from detail 13/C303. I was informed that the engineer approves of this and change will be included in As-Builts. Reinforcing is correct and expansion joint material are in place at cold joints. Okay to pour this area. -2 of the curb ramps with domes SW of trench drain are correct. The 3rd south of the crosswalk was over 8.33% but I will allow them to pour this ramp provided it is corrected and complies- this ramp is at risk. -Subgrade at main entrance at SW corner to the PCCP is correct. Okay to place AB here. Call in paving inspection prior to paving here for approval of ABC. |
|
| ENGR Paving | Scheduled |