Inspection History Details
Inspection Status: Passed
Inspection History: NPPO Pre-Construction
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/28/2026 | NPPO Pre-Construction | Passed | 1. NPPO - 3 transplants to be moved one time into the scenic corridor for required revegetation of that area. 2. Established NPPO nursery location and water source for temporary irrigation. 3. Construction trailer to be placed on site within the scenic corridor where plants have died or are non existent. |