Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Passed

Inspection History: NPPO Pre-Construction

Date Description Inspector Results Comments
04/28/2026 NPPO Pre-Construction Passed 1. NPPO - 3 transplants to be moved one time into the scenic corridor for required revegetation of that area.
2. Established NPPO nursery location and water source for temporary irrigation.
3. Construction trailer to be placed on site within the scenic corridor where plants have died or are non existent.