Inspection Status: Not Ready
Inspection History: ENGR - Drainage Structures
| Date |
Description |
Inspector |
Results |
Comments |
| 11/13/2026 |
ENGR - Drainage Structures |
|
Not Ready |
Outlet weir was not inspected prior to pour.. There is discrepancy between top of weir and floor from detail 14 page 10 on DP. Verify these elevations. Submit revision for approval and have engineer accept this drainage structure. |
| 11/17/2026 |
ENGR - Drainage Structures |
|
Passed |
Both stages of top of weir at basin A verified to plan. Weir will function as designed. Contractor provided pictures of reinforcing in floor and walls sufficient to accept it. |