Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Partial Pass
Inspection History
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2026 |
|
|
Partial Pass |
checked ramp at south east - corrected from Saturday. |
| 11/13/2026 |
|
|
Not Ready |
Sidewalk at SE side of site just west of driveway is over 5 percent running slope. This will need to be fixed or handrail installed because rise is over 6". |
| 11/17/2026 |
|
|
Passed |
Sidewall panel that was too steep just south of curb ramp at SE corner of site is corrected. |