Permit Details

Status:
In Revision
Type:
Development Package
Apply Date:
04/29/2024
Applicant:
Alexis Neuroth
Description:
Rev 1 - EV units, parking log, sewer update, started 12.22.2025 ** Ground up development for new retail store.

Permit Reviews

Permit Number - TD-DEV-0424-00140
Permit Status: In revision
Permit Description: Rev 1 - EV units, parking log, sewer update, started 12.22.2025 ** Ground up development for new retail store.
Start Date Submittal Complete Date Status  
04/29/2024 DEVELOPMENT PACKAGE NEW v.1 05/08/2024 REQUIRES RESUBMIT Review Details
09/10/2024 DEVELOPMENT PACKAGE NEW v.4 10/10/2024 REQUIRES RESUBMIT Review Details
12/22/2025 DEVELOPMENT PACKAGE NEW REVISION v.1 12/22/2025 REQUIRES RESUBMIT Review Details
01/09/2026 DEVELOPMENT PACKAGE NEW REVISION v.2 N/A IN REVIEW Review Details
11/26/2024 DEVELOPMENT PACKAGE NEW v.5 12/03/2024 APPROVED Review Details
07/22/2024 DEVELOPMENT PACKAGE NEW v.3 08/23/2024 REQUIRES RESUBMIT Review Details
05/15/2024 DEVELOPMENT PACKAGE NEW v.2 06/27/2024 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TD-DEV-0424-00140
Permit Status: In revision
Permit Description: Rev 1 - EV units, parking log, sewer update, started 12.22.2025 ** Ground up development for new retail store.
Total Outstanding Activity Conditions - 1
Date Name
09/12/2025

Outstanding Inspections

Permit Status: In Revision
Permit Number: TD-DEV-0424-00140
Permite Description: Rev 1 - EV units, parking log, sewer update, started 12.22.2025 ** Ground up development for new retail store.
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
10/10/2025 For trash and recycling enclosures N/A Partial Pass Will verify that verts are trimmed
11/10/2025 ENGR - Drainage Structures N/A Partial Pass Okay to button up forms on E2. call for inspection prior to pouring concrete.
11/28/2025 N/A Partial Pass Verified sleeves are in place.
12/11/2025 N/A Partial Pass Contractor grading for curb in the west parking lot area islands 12 different islands contractor formed up all good they can pour concrete
12/11/2025 N/A Partial Pass Contractors good to backfill the HDPE pipe approximately 40 lineal feet north of the building for the islands in front of the building
01/02/2026 Grading Progress ENGR N/A Not Ready Will reschedule for Monday, 01-05-26, Contractor is going to roll balance of west parking area on 01-03-26

Completed Inspections

Permit Status: In Revision
Permit Number: TD-DEV-0424-00140
Permit Description: Rev 1 - EV units, parking log, sewer update, started 12.22.2025 ** Ground up development for new retail store.
Total Completed Inspections - 2
Date Description Inspector Results Comments
PDSD Engineering Division Pre-Construction SITE Passed
09/22/2025 SITE - Stormwater Setup and Controls Passed NOI Good.
SWPPP inspections good up to last one on 9/4.

Track out needs to be built per detail in plan. Also in the wrong location.
Concrete washout in place but it needs to cleaned out. 75% full.
Wattle Needs to cover SW corner of side up to the curb line of the Costco parking lot.

Documents

File Name Document Type  
APPROVED BASSPRO TUCSONAZ CIVILPLANS 4_V4.PDF DOCUMENTS VIEW
BASSPRO TUCSONAZ CIVILPLANS NEW_V2.PDF DOCUMENTS VIEW
BASSPRO TUCSONAZ CIVILPLANS_V1.PDF DOCUMENTS VIEW
BASSPRO TUCSONAZ DRAINAGESTATEMENT_V1.PDF DOCUMENTS VIEW
BASSPRO TUCSONAZ GEOTECHREPORT_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW