Inspection Status: Partial Pass
Inspection History
| Date |
Description |
Inspector |
Results |
Comments |
| 03/09/2026 |
|
|
Partial Pass |
contractors good to pour the curb around the east end of the building |
| 04/09/2026 |
|
|
Partial Pass |
contractor is cutting curb grade in the back so they could use a curb machine to start boiling curb tomorrow. Everything looks good. |
| 10/20/2026 |
|
|
Not Ready |
Sidewalk adjacent to store on west side and southwest side have panels that are exceeding 2.0%. This sidewalk is missing a curb ramp shown on plans at the north end of the sidewalk next to garage doors. There is also a curb ramp missing at the multi mode pathway, connecting the crosswalk to the pathway. Curb ramp that is not poured yet south of the charging stations landing at top exceeds 2.0% and crosswalk at bottom also does not comply. |
| 12/11/2025 |
|
|
Partial Pass |
Contractor grading for curb in the west parking lot area islands 12 different islands contractor formed up all good they can pour concrete |