Inspection Status: Partial Pass

Inspection History

Date Description Inspector Results Comments
03/09/2026 Partial Pass contractors good to pour the curb around the east end of the building
04/09/2026 Partial Pass contractor is cutting curb grade in the back so they could use a curb machine to start boiling curb tomorrow. Everything looks good.
10/20/2026 Not Ready Sidewalk adjacent to store on west side and southwest side have panels that are exceeding 2.0%. This sidewalk is missing a curb ramp shown on plans at the north end of the sidewalk next to garage doors. There is also a curb ramp missing at the multi mode pathway, connecting the crosswalk to the pathway. Curb ramp that is not poured yet south of the charging stations landing at top exceeds 2.0% and crosswalk at bottom also does not comply.
12/11/2025 Partial Pass Contractor grading for curb in the west parking lot area islands 12 different islands contractor formed up all good they can pour concrete