Inspection Status: Re-inspection required
Inspection History
| Date |
Description |
Inspector |
Results |
Comments |
| 08/31/2026 |
|
|
Re-inspection required |
8/31/26: due to weather conditions footings have not passed inspection. Footings are not complete, reinforcement must be set in place to ensure 3" clearance from earth, bolts must be set in place to verify embedded length, not ready. |
| 02/17/2026 |
|
|
Partial Pass |
Contractor can pour the footing for the canopies at the entrance |
| 08/18/2026 |
|
|
Failed |
These footings on Southwest corner appear to be for required shade structures shown on this development package. Separate building permits are required. For inspection questions, please contact Joshua Garcia, Planning and Development Services, Site Inspection Supervisor. 520-540-9896 , Joshua.garcia@tucsonaz.gov |
|
|
|
Scheduled |
|
| 09/04/2026 |
|
|
Partial Pass |
Okay to pour Shade foundations |