Inspection Status: Re-inspection required

Inspection History

Date Description Inspector Results Comments
08/31/2026 Re-inspection required 8/31/26: due to weather conditions footings have not passed inspection. Footings are not complete, reinforcement must be set in place to ensure 3" clearance from earth, bolts must be set in place to verify embedded length, not ready.
02/17/2026 Partial Pass Contractor can pour the footing for the canopies at the entrance
08/18/2026 Failed These footings on Southwest corner appear to be for required shade structures shown on this development package. Separate building permits are required. For inspection questions, please contact Joshua Garcia, Planning and Development Services, Site Inspection Supervisor. 520-540-9896 , Joshua.garcia@tucsonaz.gov
Scheduled