Inspection History Details
Inspection Status: Partial Pass
Inspection History
Permit Number - TD-DEV-0424-00140
Inspection Description -
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/27/2026 | Partial Pass | good to backfill storm drain 24”. The south west corner of the building. | ||
| 01/30/2026 | Partial Pass | Area I am inspecting today 12" HDPE at SW of Bldg. 2 legs of 12" Trench is dug correct from 90 deg elbows at building. Okay to bed this trench to 70' toward Catch Basin. At 70' 12 inch HDPE is in place and bedded correctly to the catch basin. Min 1 % slope correct. OK to backfill this stretch. Two more legs of 12 inch HDPE pipe to the building are not dug yet and will be soon. On the other side of Catch Basin there is 18 inch HDPE that extends out two sticks joined correctly and bedded correct. Min 1 % slope correct. Both joints at the catch basin have been inspected previously. OK to backfill this 40' 18" leg.. | ||
| 02/03/2026 | Partial Pass | contractors good to backfill the storm drain in the back of the building hundred lineal feet. | ||
| 09/26/2025 | Partial Pass | 18" storm drain, 60' from T1 to T2: pipe and catch-basins are correct, depth and elevations are correct. Okay to backfill. | ||
| 09/30/2025 | Partial Pass | Contract is good to backfill 124 lineal feet of 24 inch pipe. Northwest area. | ||
| 10/03/2025 | Partial Pass | Okay to backfill HDPE runs at catch basin | ||
| 10/06/2025 | Partial Pass | Contractor, good to backfill the 18 inch HDPE 134 lineal feet and the other HDPE 18 inch 100 foot | ||
| 10/08/2025 | Partial Pass | Contractor is good to backfill the 12 inch HDPE pipe going into the building approximately 100 lineal feet | ||
| 10/10/2025 | Partial Pass | okay to backfill | ||
| 10/21/2025 | Partial Pass | Contractors good to backfill the 12 inch HDPE pipe and the 24 inch. There is 180 lineal feet of the 12 inch and 100 feet of the 24 inch and two laterals at 60 feet each of 12 inch. | ||
| 10/24/2025 | Partial Pass | Okay to backfill SD run CB2-CB3 | ||
| 10/29/2025 | Partial Pass | contractors good to install the collar on the south west corner of the project. Contractor also has another one to install a collar on the north east quadrant contractor give us a call before back filling | ||
| 11/05/2025 | Partial Pass | Contractors good to backfill the storm drain one of them at the north west corner contractor tap into the existing catch basin. The other one is at the north east corner tap into the existing catch base there also are good backfill | ||
| 11/19/2025 | Partial Pass | shading verified via photo. okay to backfill | ||
| 11/28/2025 | Not Ready | Additional bedding and shading required prior to backfill. Send photos or reschedule prior to backfill. | ||
| 12/03/2025 | Partial Pass | Contractors good to backfill the HDPE pipe for the island in the parking lot area | ||
| 12/08/2025 | Partial Pass | Contractor is good to backfill 12 inch HDPE pipe in the front west side | ||
| 12/11/2025 | Partial Pass | Contractors good to backfill the HDPE pipe approximately 40 lineal feet north of the building for the islands in front of the building | ||
| 12/17/2025 | Partial Pass | Contractors good to backfill storm drain from the roof on the southeast side of the building | ||
| 12/22/2025 | Partial Pass | Contractor can backfill 12 inch HDPE pipe at the northwest corner of the building | ||
| 12/23/2025 | Partial Pass | Contractors good to backfill the 12 inch HDPE pipe up to the north west part of the building storm drain from the roof | ||
| 12/30/2025 | Partial Pass | Contractors good to backfill the 12 inch HDPE pipe coming from the roof to the main storm drain northside |