Inspection Status: Passed

Inspection History: ENGR - Drainage Structures

Date Description Inspector Results Comments
04/30/2026 ENGR - Drainage Structures Passed
10/31/2025 ENGR - Drainage Structures Partial Pass Discussed Catch Basin construction where plan detail is missing at NW corner of site. will reinspect prior to pouring the floor.
11/06/2025 ENGR - Drainage Structures Partial Pass Okay to pour invert slab of CIP Catch Basin at NW corner of the site.
11/10/2025 ENGR - Drainage Structures Partial Pass Okay to button up forms on E2. call for inspection prior to pouring concrete.