Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Inspection Status: Partial Pass

Inspection History: ENGR - Drainage Structures

Permit Number - TD-DEV-0424-00140

Inspection Description - ENGR - Drainage Structures

Inspection Status - Partial Pass

Date Description Inspector Results Comments
10/31/2025 ENGR - Drainage Structures Partial Pass Discussed Catch Basin construction where plan detail is missing at NW corner of site. will reinspect prior to pouring the floor.
11/06/2025 ENGR - Drainage Structures Partial Pass Okay to pour invert slab of CIP Catch Basin at NW corner of the site.
11/10/2025 ENGR - Drainage Structures Partial Pass Okay to button up forms on E2. call for inspection prior to pouring concrete.