Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR - Drainage Structures
Permit Number - TD-DEV-0424-00140
Inspection Description - ENGR - Drainage Structures
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/31/2025 | ENGR - Drainage Structures | Partial Pass | Discussed Catch Basin construction where plan detail is missing at NW corner of site. will reinspect prior to pouring the floor. | |
| 11/06/2025 | ENGR - Drainage Structures | Partial Pass | Okay to pour invert slab of CIP Catch Basin at NW corner of the site. | |
| 11/10/2025 | ENGR - Drainage Structures | Partial Pass | Okay to button up forms on E2. call for inspection prior to pouring concrete. |