Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
9537 E OLD VAIL RD
Apply Date:
04/24/2024
Applicant:
Description:
16,000 SF Office / Commercial Storage on a 1.7 AC Site

Permit Reviews

Permit Number - TD-DEV-0424-00137
Permit Status: Complete
Permit Description: 16,000 SF Office / Commercial Storage on a 1.7 AC Site
Start Date Submittal Complete Date Status  
07/12/2024 DEVELOPMENT PACKAGE NEW v.2 08/14/2024 REQUIRES RESUBMIT Review Details
04/25/2024 DEVELOPMENT PACKAGE NEW v.1 06/02/2024 REQUIRES RESUBMIT Review Details
09/09/2024 DEVELOPMENT PACKAGE NEW v.3 09/11/2024 APPROVED Review Details
04/02/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/03/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TD-DEV-0424-00137
Permit Status: Complete
Permit Description: 16,000 SF Office / Commercial Storage on a 1.7 AC Site
Total Outstanding Activity Conditions - 1
Date Name
10/01/2025 CRWHPLAN NEEDS TO BE CREATED PRIOR TO CLOSEOUT

Outstanding Inspections

Permit Status: Complete
Permit Number: TD-DEV-0424-00137
Permite Description: 16,000 SF Office / Commercial Storage on a 1.7 AC Site
Total Outstanding Inspections - 8
Last Inspection Date Description Inspector Results Comments
10/07/2024 PDSD Engineering Division Pre-Construction SITE N/A Partial Pass I met on the site this morning with members of KE&G construction company to discuss the project they will be starting.We looked over the site no work has been started at this time but, will begin within the next week. I met with Kurt Rice and Eddie Norris, Eddie Norris will be the site supervisor for this site. He advised me of what they will be doing in the near future starting with the removal of all the plants and have them placed in a nursery during the construction . They will start on minor grading and grubbing of the site once they have the NPPO approved for the nursery. they will be posting the site with their sign as required this coming week and will provide us with the NOI (Notice of Intent) for the site at that same time. Ron will remind them on his first meeting to pick up the notice of intent information that they are to call their site every two weeks for an inspection for the SWPPP.
10/07/2024 NPPO Pre-Construction N/A Partial Pass I met on the site this morning with members of KE&G construction company to discuss the project they will be starting.We looked over the site no work has been started at this time but, will begin within the next week. I met with Kurt Rice and Eddie Norris, Eddie Norris will be the site supervisor for this site. He advised me of what they will be doing in the near future starting with the removal of all the plants and have them placed in a nursery during the construction . They will start on minor grading and grubbing of the site once they have the NPPO approved for the nursery. they will be posting the site with their sign as required this coming week and will provide us with the NOI (Notice of Intent) for the site at that same time. Ron will remind them on his first meeting to pick up the notice of intent information that they are to call their site every two weeks for an inspection for the SWPPP.
03/10/2025 SITE - Stormwater Follow-up N/A Complete (Recurring) No concerns at this time
12/11/2025 ENGR Grading Final N/A Re-inspection required AB not ready.
11/15/2024 ENGR - Drainage Structures N/A Partial Pass single barrel drainage pipe, 80’ good to backfill. 11/15/24
12/31/2025 N/A Partial Pass Okay to pour sidewalk along front of building.
01/23/2026 ENGR Engineering Final N/A Re-inspection required Site is not complete, not ready for engineering final. Items that need finished are listed below:
1. Landscaping - plants, irrigation, ground cover
2. Refuse Enclosure - mount doors, grout wall, fill bollards
3. Site striping - parking lines, cross-walk
4. ADA parking - access isle, signs
5. Site wall - finish walls
6. Address numbers - visible from Old Vail Road
12/31/2025 For trash and recycling enclosures N/A Partial Pass Okay to pour refuse enclosure slab and approach.

Completed Inspections

Permit Status: Complete
Permit Number: TD-DEV-0424-00137
Permit Description: 16,000 SF Office / Commercial Storage on a 1.7 AC Site
Total Completed Inspections - 7
Date Description Inspector Results Comments
10/15/2024 NPPO Pre-Construction Passed NPPO is completed
12/12/2025 ENGR Grading Final Passed AB correct. Submit compaction reports to the portal. Ok to pave parking area. Landscaping elevations and basins correct.
01/21/2026 ENGR - Drainage Structures Passed Inlets/outlet structures, drainage structures, and WHIA/channels are all installed in accordance with approved plans. Site drainage work is complete in accordance with approved plans.
01/23/2026 Passed Concrete sidewalks are complete and acceptable.
02/27/2026 ENGR Engineering Final Passed Site is complete in accordance with approved plans.
02/27/2026 For trash and recycling enclosures Passed Trash enclosure is complete in accordance with approved plans.
02/27/2026 Final inspection to ensure all landscape and water harvesting SITE Passed All water harvesting areas are complete in accordance with approved plans.

Documents

File Name Document Type  
2-5418A - DRAINAGE REPORT - 2024.07.10_V1.PDF DOCUMENTS VIEW
APPROVED 2-5418A - DEVELOPMENT PACKAGE - 2024.07.10_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW