Inspection History Details
Inspection Status: Partial Pass
Inspection History: For trash and recycling enclosures
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/23/2026 | For trash and recycling enclosures | Partial Pass | Okay to grout refuse enclose wall in a single lift, third party sign off and construction inspector witness (Refuse Enclosure Inspection) requested for the six foot lift. Okay to grout final lift of the site wall on the East border. Reinforcement spacing has been corrected since the inspection earlier today related to permit TC-COM-0724-01311. |
|
| 02/27/2026 | For trash and recycling enclosures | Passed | Trash enclosure is complete in accordance with approved plans. | |
| 11/04/2025 | For trash and recycling enclosures | Partial Pass | Okay to pour enclosure wall footing. | |
| 12/31/2025 | For trash and recycling enclosures | Partial Pass | Okay to pour refuse enclosure slab and approach. |