Inspection Status: Partial Pass
Inspection History: NPPO Pre-Construction
| Date |
Description |
Inspector |
Results |
Comments |
| 10/07/2024 |
NPPO Pre-Construction |
|
Partial Pass |
I met on the site this morning with members of KE&G construction company to discuss the project they will be starting.We looked over the site no work has been started at this time but, will begin within the next week. I met with Kurt Rice and Eddie Norris, Eddie Norris will be the site supervisor for this site. He advised me of what they will be doing in the near future starting with the removal of all the plants and have them placed in a nursery during the construction . They will start on minor grading and grubbing of the site once they have the NPPO approved for the nursery. they will be posting the site with their sign as required this coming week and will provide us with the NOI (Notice of Intent) for the site at that same time. Ron will remind them on his first meeting to pick up the notice of intent information that they are to call their site every two weeks for an inspection for the SWPPP. |
| 10/15/2024 |
NPPO Pre-Construction |
|
Passed |
NPPO is completed |