Permit: TD-DEV-0423-00198
Permit Details
Apply Date:
04/02/2023
Applicant:
Don Perkins
Description:
Restricted Access - *Revision #1 (building sq ft.) started 5/6/24* Development package for City of Tucson Southside Public Safety Facility Police Substation and Fire Station NO. 10
Permit Reviews
Permit Number - TD-DEV-0423-00198
Permit Status: Inspections
Permit Description: Restricted Access - *Revision #1 (building sq ft.) started 5/6/24* Development package for City of Tucson Southside Public Safety Facility Police Substation and Fire Station NO. 10
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/06/2024 | DEVELOPMENT PACKAGE REVIEW v.1 | 05/13/2024 | REQUIRES RESUBMIT |
| 04/03/2023 | DEVELOPMENT PACKAGE REVIEW v.1 | 06/01/2023 | REQUIRES RESUBMIT |
| 06/03/2024 | DEVELOPMENT PACKAGE REVIEW v.2 | 06/25/2024 | REQUIRES RESUBMIT |
| 08/09/2024 | DEVELOPMENT PACKAGE REVIEW v.3 | 09/05/2024 | APPROVED |
| 12/04/2023 | DEVELOPMENT PACKAGE NEW v.1 | 12/28/2023 | REQUIRES RESUBMIT |
| 01/04/2024 | DEVELOPMENT PACKAGE NEW v.2 | 01/05/2024 | APPROVED |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TD-DEV-0423-00198
Permite Description: Restricted Access - *Revision #1 (building sq ft.) started 5/6/24* Development package for City of Tucson Southside Public Safety Facility Police Substation and Fire Station NO. 10
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/24/2024 | PDSD Engineering Division Pre-Construction SITE | N/A | Canceled | |
| 11/07/2024 | N/A | Partial Pass | Okay for grouting sleeves. | |
| 11/15/2024 | For trash and recycling enclosures | N/A | Partial Pass | Okay to pour footing & Bollards. Gate Posts will pour with slab & Apron |
| 10/09/2025 | ENGR Paving | N/A | Partial Pass | 10/9/25 Driveway area at South Entrance to parking lot onto Fair. Plan Keynote 3 in Construction Notes- 8" PCCP states 6" ABC/Native compacted to 95%. It then refers to detail 1 sheet 7. This Detail shows ABC compacted to 100%. Geotec Report states that structural fill underneath Concrete Pavement to be compacted to minimum 95%. RFI the Engineer for clarification on this Detail. ABC is testing at 97% in area of concrete placement. Forms are correct with dowels at joint. Thickness correct. Slope correct. Use expansion material to full thickness of concrete. Okay to pour this area pending weather. |
| 10/30/2024 | N/A | Partial Pass | good to pour footing on south fence line | |
| 09/18/2025 | N/A | Partial Pass | 9/18/25 Curb forms defining the south side of driveway at north west corner of site. Curb opening, subgrade good. Trackout rock needs to be cleared out from north end of forms, once this area is correct OK to pour this curb. Curb forms to the south of building. Forms and subgrade are good expansion material in place correctly. Layout correct to survey. These forms are not 100% finished but are Okay to pour based on prior record. 9/18/25 Curbs that has been poured on this site are within acceptable tolerances. Finish looks good, curb openings, and elevations are correct to plan. These curbs include the majority of the curbing on site in this phase on the south side and west side of the building all the way over to the large retention basin on north side of building. There are a couple islands and other areas that are not yet poured/formed. Opening in site wall needed for basin overflow noted on plans at corner 20 yards or so south of driveway at NE of site. |
Completed Inspections
Permit Status: Inspections
Permit Number: TD-DEV-0423-00198
Permit Description: Restricted Access - *Revision #1 (building sq ft.) started 5/6/24* Development package for City of Tucson Southside Public Safety Facility Police Substation and Fire Station NO. 10
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/04/2024 | PDSD Engineering Division Pre-Construction SITE | Passed |