Inspection History Details
Inspection Status: Re-inspection required
Inspection History: ENGR - Drainage Structures
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/04/2026 | ENGR - Drainage Structures | Re-inspection required | contractor is not on site the company that’s going to drill for the drywall on the south east quadrant of the project | |
| 03/05/2026 | ENGR - Drainage Structures | Partial Pass | contractors drill for the drywall at this time they’re about 80 feet deep. Contractor sent in photos after they completed. | |
| 04/15/2026 | ENGR - Drainage Structures | Partial Pass | Inspecting the Planters- waterproofing, and weep hole drains. Trico waterproofing product in place, and iso board is in place up to where continuous rock pocket will be placed. OK to finish planters. |