Inspection Status: Partial Pass
Inspection History
| Date |
Description |
Inspector |
Results |
Comments |
| 04/01/2026 |
|
|
Partial Pass |
Trench and pipe correct for the 2-1” irrigation laterals in place 12-16” deep going around the NE corner basin. Ok to backfill. |
| 04/08/2026 |
|
|
Partial Pass |
The Landscape/Lid swale detail on LL2.2 is followed with aggregate/filter fabric/2”sandbase angular rock layers correct between the parallel headers. The Irrigation laterals are also correct. In WHIA 2 the Irrigation lines, equipment, landscaping and ground covers are almost complete and per plan. Landscaping and the Irrigation laterals and equipment are being installed per plan irrigation areas #2 and 4 and into planters correct. |
| 04/20/2026 |
|
|
Partial Pass |
contractor can go ahead and backfill the irrigation line at the corner of the property that runs south east corner and run from the south east corner to north they can backfill all the irrigation lane |